My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/01/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/01/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:36:04 PM
Creation date
6/5/2018 10:37:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/01/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified�or`indicated in the Contract <br />Documents. The Work is generally described assf'ollows: \�Xisting\e <br />Proposed project consists of the extension of the astbnd ri ht <br />p p l �, 9 <br />turn lane along 85t'' Street (C.R. 510) at. -661h --Avenue (approximately 60/feet long). <br />Improvements include milling and resurfacing of`ex ting asphalt pavement, curb and <br />gutter, pavement markings, grading a4 sodding. �f <br />, I <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work un der,the�Contract Documents maybe the whole or only a <br />part is generally described as follows � <br />Project Na <br />roject <br />P%F%I IVGG J G11 11-1 GG R' / \` <br />I i ` V / <br />3.01 The Indian River C�ou/nty Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />r <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 90th calendar day after the date <br />when the Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />@BCL@DC0D8BAD.q5 <br />00520-2 <br />C:\UsersVegistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@DCOD8BAD\@BCL@DCOD8BAD.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.