My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/01/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/01/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:36:04 PM
Creation date
6/5/2018 10:37:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/01/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by ENGINEER is acceptable to CONTRACTOR. <br />J. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 00520-1 to 00520-9, i <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to <br />4. Sample Certificate of Liability I <br />5. Contractor's Application for <br />6. Certificate of Substantial Corrholetion (pages 0063( <br />7. Contractor's Final Certification `o��Work (page: <br />8. Professional Su Mapper''t Certification as <br />Work (page 00634-1); <br />a <br />10. Supplemeni <br />r,�Secificatio <br />ovisions); <br />12: -Drawings -c( <br />each sheet <br />13. Addenda if a plicable <br />inclusive);,, <br />is \". <br />to 00622=6 inclusive); <br />to 00630-2, inclusive); <br />to 00632-2, inclusive); <br />Elevations and Locations of the <br />inclusive); <br />to 00800-11, inclusive); <br />1 (General Requirements) and Division 2 (Technical <br />a cover sheet and sheets numbered 1 through 8, inclusive, with <br />following general title: (CR510) 85TH STREET RIGHT TURN <br />14. Appendices to this Agreement (enumerated as follows): <br />Appendix A — No Permits Required <br />Appendix B — Fertilizer Ordinances <br />Appendix C — Indian River County Traffic Engineering Division Special Conditions for <br />Right -of -Way Construction <br />15. CONTRACTOR'S BID (pages 00310-1 to 00310-6, inclusive); <br />16. Bid Bond (page 00430-1 inclusive), Qualifications Questionnaire (page 00456-1 to <br />00456-4, inclusive), List of Subcontractors (page 00458-1); <br />@13CL@DC0D8BAD.99 <br />00520-6 <br />C:\UsersVegistar\AppData\Local\Temp\BCL Technologies\easyPU 8\@BCL@DCOD8BAD\@BCL@DCOD8BAD.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.