My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/01/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/01/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:36:04 PM
Creation date
6/5/2018 10:37:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/01/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIN, <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka P.E., Public Works Director <br />FROM: Andy Sobczak, Infrastructure Project Manager <br />SUBJECT: Work Order No. 5, REI Engineers, Inc. — Design and Replacement of Indian <br />River County Hobart Water Treatment Facility Roof <br />DATE: April 20, 2018 <br />DESCRIPTION AND CONDITIONS <br />On April 18, 2014, the Board of County Commissioners approved a Continuing Contract Agreement <br />with REI Engineers, Inc. to perform roofing consultation services to include evaluations of existing <br />roofing conditions, design solutions for remedial work, design solutions for roof replacement, <br />preparation of design documents, and project management. On February 6, 2018, the Board of <br />County Commissioners approved an Extension to the Continuing Contract for an additional 3 -years. <br />On January 16, 2018, REI Engineers, Inc. submitted a proposal for the design, assistance in bidding, <br />and construction administration for the replacement of the roof at the County's Hobart Water <br />Treatment Facility (NROWTF). <br />FUNDING <br />Funding for the project is included and budgeted in Utilities/Operating Fund/Replacement and <br />Renewal account for NROWTF Roof Replacement — acct#47123536-044699-18506. Operating <br />funds are derived from water and sewer sales. <br />RECOMMENDATION <br />Staff recommends that the Board of County Commissioners approve Work Order #5 for REI <br />Engineers, Inc. to design, assist in bidding, and perform construction administration services for the <br />replacement of the existing roof at the Hobart Water Treatment Facility, and authorize the Chairman <br />to execute Work Order #5 in the lump sum amount of $23,050.00. <br />FAPubhc Works\ENGINEERING DIVISION PROJECTS\1802 IRC North RO Plant Roof Replacement\I-Admin\Agenda Items\BCC\IRC-1802 North RO Plant Roof Replacement WO 5 Staff <br />Report.doc <br />172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.