Laserfiche WebLink
Figure 213: Wetland Boardwalk Plan <br />l , <br />"+ra Round Island South Conservation Are <br />Elevation (Feet, ROUND ISLAND <br />NAVD88, 5 ft grid) SOUTH CA <br />I <br /><1 <br />�1-3 <br />3-8 <br />�8-13 <br />--� 26 ft f <br />ROUND <br />11 <br />NDIAN R_ -- <br />RIVER <br />ROUND ISL) <br />` SOUTH CA <br />(60.7 ac) <br />s <br />o o <br />'OEm <br />1 <br />12,ft�s " 10 ft <br />r <br />nrwn�e�e.:.x <br />1` <br />A <br />Legend <br />Existing Trails <br />Boardwalk <br />Boardwalk <br />Dimensions <br />Project Area <br />County Park <br />—r Conservation <br />-" Land Boundary <br />County <br />Boundary <br />W 50 100 <br />C Feet <br />NOTE: Elevated footpaths will be constructed at least 2' above the Mean <br />High Water Elevation. The wetland overtook will be constructed per applicabl <br />criteria within Chapter 40C-400.488, F.A.C. The platform area will be at least <br />5' above the Mean High Water elevation, will include standard hand rails, <br />and signage denoting that no boat mooring is permitted. <br />Data Sources: IRCGIS, IRC Parks, 2017.; eve on Data; 2007 FDEM LID141 <br />Aerial Imagery: Pictomet D,e tuber 2018 <br />HT-ig2 oundls and a alk Ian Li A .mxci MaD ate: 8125/2 <br />