My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/01/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/01/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:36:04 PM
Creation date
6/5/2018 10:37:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/01/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLE AGREEMENT <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Johnson - <br />Davis, Inc. (hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual <br />covenants hereinafter set forth, agree as follows: <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />The proposed work generally consists of furnishing all labor, materials, tools and equipment required <br />to remove and replace an existing air release valve (ARV), a portion of a 24" diameter force main, and <br />associated appurtenances in Indian River County. The site is located along the west side of US Highway <br />1 approximately 400 feet south of Schumann Drive. The project will consist of the installation of <br />ductile -iron pipe restraints; the installation of wet taps; the installation of a temporary by-pass <br />forcemain; the installation of line stops; the removal and replacement of an existing ARV and related <br />concrete manhole structure; the removal of a segment of ductile iron forcemain and its replacement <br />with a PVC forcemain, and removal of the temporary by-pass forcemain. <br />ARTICLE 2 - THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: <br />Bid Number: <br />Project Address: <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />US 1- Air Release Valve and 24" Forcemain Replacement <br />2018047 <br />10595 US Highway 1, Sebastian, FL 32958 <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 90th day after the date <br />when the Contract Times commence to run. <br />3.03 Liquidated Damages <br />Page 1 of 8 <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.