Laserfiche WebLink
POOK icJ PAGE 542 <br />Commissioner Eggert expressed her opinion that there is too <br />much government and stated that she could not vote for the signs. <br />Chairman Tippin asked for any further discussion and there was <br />none. <br />THE CHAIRMAN CALLED FOR THE QUESTION. THE MOTION <br />FAILED 1-4, COMMISSIONERS TIPPIN, MRCHT, BIRD AND -- <br />EGGERT DISSENTING. <br />FORCE MAIN AND ROADWAY IMPROVEMENTS/OSLO ROAD AND <br />11 K41 Do : I C" so VAM <br />The Board reviewed a Memorandum of October 12; 1994: <br />TO: James E. Chandler, <br />County Administrator <br />THROUGH: James W. Davis P.E. <br />Public Works Director <br />FROM: Terry B. Thompson, P.E. <br />Capital Projects Manager <br />SUBJECT: Force Main and Roadway Improvements - <br />Oslo Road and Old Dixie Highway <br />Change Order No. 1 <br />DATE: October 12, 1994 FILE: OS-ODC01AGN <br />DESCRIPTION AND -CONDITIONS <br />The County recently obtained the right-of-way necessary to extend the Oslo Road <br />widening project from 500 feet west of Old Dixie to Timber Ridge. The extension is <br />approximately 1200 feet long and includes the construction of a 237 foot long five lane <br />section, a 320 fbot long transition from five lanes to three lanes, and a 643 foot long three <br />lane section that extends west to connect with the three lane section at Timber Ridge. <br />Dickerson Florida, Inc is currently constructing the widening improvements on Oslo Road <br />and Old Dixie Highway. Dickerson's bid amount for this project was $ 121,685.64 lower <br />than the next bidder. Staff feels that issuing a change order to the current contract is the <br />fastest and most cost effective means of extending the Oslo Road widening. <br />The attached Change Order No. 1 is based on contract unit prices where applicable. The ' <br />total price increase for additions to the contract is $189,911.58. Change Order No. 1 also <br />includes ($53;272.14) in deductions to the contract. These decreases resulted from value <br />engineering proposals submitted .by_ the Contractor. The net change in the contract <br />amount is $136,639.44. This added to the current contract amount of $1,049,006 results <br />in a new contract amount of $1,185,645.44. <br />OCTOBER 18, 1994 32 <br />