Laserfiche WebLink
C. Provided that all federal, state and local regulations are met County potable water <br />shall be made available for domestic use to any other future Owner(s) at normal <br />County billing rates which shall include impact fees and other connection costs. <br />D. This Plan fully addresses the potential interference with the Van Antwerp's use of <br />water from existing wells No. 1 through No. 5. <br />E. This is the Mitigation Plan for the Properties, regardless of any future subdivision of <br />the Properties, even if used for agricultural type use. <br />F. The IRCDUS has submitted Technical Memorandudated July 20, 2017 by JLA <br />Geosciences, Inc., and the SJRWMD acknowledges/that IRCDUS is not the only <br />Existing Legal User (ELU) causing interferencelt/o the Van Antwerp withdrawals. <br />G. This Plan has taken into account future•,pot t expansion at the IRCDUS North <br />Wellfield. <br />H. Owner(s) shall provide the IRCDUS and/or IRCDUS:s.Representative access to Well <br />No. 1 and Well No. 6 for routine inspection/maintenance. N�� <br />I. The IRCDUS is not responsible forthe.ambient water quality of the newly constructed <br />Well No. 6 if degradation due `to other users occurs The IRCDUS cannot be held <br />responsible for changes in water 'quality orquantity that may occur in wells within the <br />Properties as r suit of'the Owners)\use o-Ptheiwells. \� <br />r <br />J. Interferences to,other ELU,s of ground water caused -by Well No. 6 will not be the <br />responsibility of IRCDUS. % <br />K. IRCDUS shall no]onger�be responsible for,,this Plan in the event IRCDUS ceases to <br />utilize water from the Hobart�wellfiel' .If a portion of the North (Hobart) wellfield is <br />utilized and IRCDUS\demonstrates to'SJRWMD that its withdrawals no longer <br />interfere with the VanAntwerp,wells through data or other modeling documentation <br />as approved.by SJRWMD -this plan shall become null and void. If the plan is deemed <br />to be,null and, -void, IRCDUS shall continue to provide potable water to the owner(s) <br />at the normal`County billing ,'rates provided that all federal, state and local regulations <br />are met. <br />L. The BCC or IRCDUS/is not responsible for potential damage to the equipment <br />resulting from the misuse or neglect by the Owner(s). If any such misuse is detected <br />by IRCDUS or IRCDUS's well contractor, the owner may elect to hire their own <br />independent outside expert for an opinion. <br />M. Upon completion of the construction activities listed in items 1-4, the IRCDUS will <br />resume normal operations at the North (Hobart) wellfield. <br />163 <br />