My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/08/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/08/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:39:24 PM
Creation date
6/12/2018 2:40:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/08/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 5 <br />Kimfep Horn <br />April 24, 2018 <br />Mr. Arjuna Weragoda, P.E. <br />Indian River County Utilities <br />1801 271' Street <br />Vero Beach, FL 32960 <br />RE: Van Antwerp Property Water Supply Restoration Project; Bid No. 2018038 <br />KHA Project No. 044572046 <br />Dear Mr. Weragoda, <br />Indian River County Utilities (IRCU) publicly advertised and scheduled a mandatory pre-bid meeting <br />held on February 14, 2018 at 2:00 PM for the Van Antwerp Property Water Supply Restoration project. <br />The bids were publicly opened and read on February 28, 2018 at 2:00 PM. A total of three (3) bids <br />were received for the project. The contractors that provided bids were All Webbs Enterprises, Inc. <br />(AWE), A.C. Schultes (ACS), and Applied Drilling Engineering, Inc. (ADE). The attached bid tabulation <br />includes a summary of the bids received. The bids ranged from $107,140 to $166,870, which also <br />included a 10% contingency. The low bid of $107,140 was received from All Webbs Enterprises, Inc. <br />The attached Engineer's Opinion of Probable Cost estimates the project cost at $95,321, without a 10% <br />contingency. Without the contingency, the low bid was within 1 % of the cost estimate. <br />Kimley-Horn and Associates, Inc. reviewed the bid proposals and the results of our review are as <br />follows: <br />ACS was not reviewed because it was disqualified for failure include disclosure. <br />All bidders provided signed Addendum #1. <br />Based on our review of the information provided, All Webbs Enterprises, Inc. (AWE) submitted the <br />lowest responsive, responsible bid for the project and we see no reason not to award the bid to AWE. <br />Please do not hesitate to contact me at (561) 845-0665 if you have any questions. <br />Sincerely, <br />KIMLEY-HORN AND ASSOCIATES, INC. <br />- - - ----- -- - ---- - - <br />Mark D. Miller, P.E. <br />Vice President <br />Encl: IRCU Bid Tabulation <br />Engineer's Opinion of Probable Cost <br />cc: Jim Andersen, P.G., JLA Geosciences <br />File <br />1920 Wekiva Way, Suite 200, West Palm Beach; FL 33411 561 845 0665 <br />171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.