Laserfiche WebLink
Van Antwerp <br />Draft Well Mitigation Plan <br />and <br />Award of B i d <br />BCC Meeting <br />May 8, 2018 <br />Timeline <br />1. April 2012 - Van Antwerp's (VA) noticed loss of artesian flow <br />2. June 2012 - IRCDUS ran potable water to VA residences/packing <br />house <br />3. May 2013 - IRCDUS retrofitted 2 VA wells <br />4. IRCDUS ran Hobart well field at full capacity with varying time <br />intervals on following dates: <br />■ May 24, 2013 <br />■ July 2013 <br />■ December 20 to 23, 2015 <br />5. April 10, 2017 - VA's noticed loss of artesian flow during a IRCDUS <br />full capacity testing <br />6. May 23, 2017 - IRCDUS issued PO to KHA/JLA to assist in collecting <br />data and to assess the VA wellfield issues <br />7. June 2017 - IRCDUS installed a temporary pump and piping in <br />preparation of VA's planting season <br />8. November 21, 2017 - BCC approved W.O. No.16 for KHA to start the <br />design on the agreed solution <br />5/08/2018 <br />)a.G'.I . <br />179-1 <br />