My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/08/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/08/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:39:24 PM
Creation date
6/12/2018 2:40:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/08/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preferred Option - <br />Cost <br />Accepted by VA, SJRWMD & IRCDUS <br />Highlights <br />❖: Furnish a new Well No. 6 for agricultural use, which will be <br />a fully permitted 6" UFA well equipped with a submersible <br />pump, new concrete well pad, electrical service and control <br />panel. <br />❖ ' etrofit existing Well No. 1 for agricultural use, with a <br />submersible pump after video logging. A new well head will <br />be provided. <br />❖ Provide annual maintenance inspections on Well No. 6 and <br />Well No. 1 and replace pumps/motors, if needed. <br />❖ Continue to provide County potable water. <br />Cost Incurred by IRCDUS <br />flask <br />Description' <br />Cost <br />1 <br />. <br />Connected the properties to County water via 3" PVC water main (lune 2012)- 3" <br />main,ipproximately 995 LF <br />$20,319.24 <br />2 <br />Restoration of two irrigation wells (May 2013), with 2" diameter pipe dropped <br />inside both casings that would allow the existing pump to lift water up to 26' <br />below the ground surface and continue pumping to the irrigation system. <br />$ 5,960.00 <br />-- 3 "� <br />Van Ant w Fp Water Supply Evaluation (Kimley-Horn/JLA), May 2017 <br />$22,174.00 <br />4/ ' <br />/ <br />Temp rary pump rental at Well No: 5 <br />Ju 2017 -March 2018 <br />$12,578.42 <br />-5 = <br />Pi;Ang from Well No: 5 to Southern Ditch - " ---- — <br />--$ 8,500.00- <br />500.00`5 <br />5 <br />andard connection costs 6 ERUs + meters + deposits) <br />$ 8,720.00- <br />720.00`6 <br />6 <br />otable water consumption (2014 -present, -does not go back to 2012) - <br />- " $ 8,869.93- <br />- - -" " Total <br />$87,121.59 <br />111 --jun purposes only, not margeu to vw <br />Cost Required by IRCDUS for accepted solution <br />5/08/2018 <br />1-79.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.