My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/08/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/08/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:39:24 PM
Creation date
6/12/2018 2:40:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/08/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1 includes project planning and management responsibilities. Task 2 includes meeting <br />attendance and interaction with regulatory agencies. Task 3 includes preparation of the annual <br />environmental liability evaluation in response to Governmental Accounting Standards Board <br />Statement No. 49 (GASB No. 49), Accounting and Financial Reporting for Pollution Remediation <br />Obligations, which requires the inclusion and calculation of pollution remediation obligations. <br />Task 4 includes field preparation, groundwater sampling, and water level measurements (for a <br />total of 56 wells). Task 5 includes monitoring well maintenance to repair well pads at three <br />locations. Task 6 includes brush clearing activities to remove overgrowth impeding access for <br />sample collection. Task 7 includes data evaluation and semi-annual reporting. <br />Overall, the current work order reflects a greater requested level of effort than previously <br />provided by Geosyntec related to needed well maintenance and brush clearing activities, and a <br />more rigorous quantitative statistical evaluation to support possible reduction in the quantity <br />and frequency of the sampling activities. <br />FUNDING: <br />Funding for this work is budgeted and available in account number 31521734-033490-03004, <br />which is the one cent sales tax fund used for infrastructure needs of the County. Costs <br />associated with the landfills are authorized uses of the one cent sales tax in addition to <br />infrastructure. <br />Description <br />Account Number Amount <br />One Cent Sales Tax Fund — Infrastructure <br />31521734-033490-03004 $92,798 <br />Needs <br />RECOMMENDATION: <br />Staff recommends that the SWDD Board approves and authorizes the Chairman to sign the <br />CCNA-2018 Work Order No. 1 authorizing Geosyntec to provide groundwater <br />monitoring/reporting and related consulting services for the former Gifford Road Landfill in <br />compliance with FDEP requirements for a period of one year, not to exceed fee of $92,798. <br />ATTACHMFNT- <br />Geosyntec CCNA2018 WO No. 1 <br />@BCL@040E7AOC.doc Page-2- <br />207 <br />age-2- <br />207 <br />
The URL can be used to link to this page
Your browser does not support the video tag.