My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/08/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/08/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:39:24 PM
Creation date
6/12/2018 2:40:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/08/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-60 <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />osn 7 <br />Page 1 of 1 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 436416-1-54-01 <br />This exhibit forms an integral part of the State -Funded Grant Agreement between the State of Florida, Department of <br />Transportation and <br />INDIAN RIVER COUNTY (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 3.5 MILES: 58TH Avenue/CR-613 from 57th Street to 85th Street/CR-510 <br />PROJECT DESCRIPTION: This Project will consist of the rehabilitation 3.5 miles of the existing pavement section on 58th <br />Avenue from 57th Street to 85th Street/CR-510 utilizing full depth reclamation technique. The intersection fo 691h Street will <br />be upgraded to provide left -turn movement in all directions. The 69th Street intersection upgrade will include full depth <br />reclamation pavement technique, milling of existing pavement and a full signalized intersection. The newly reconstructed <br />roadways will provide two-lane travel, with 5 -foot bike lane and stabilized shoulders. The pavement design will follow the <br />DEPARTMENT'S flexible pavement design and will include structural course and friction course. Other improvements <br />include, utility relocations and installation of pavement markings. <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Construction to be completed by JUNE 30, 2020. <br />If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.