My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/15/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/15/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 2:36:38 PM
Creation date
6/12/2018 3:04:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/15/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Inspection and certification of welds and mechanical fasteners required by the <br />IRC Building Department. The bid documents and construction specification <br />will include this as a requirement for the contractor to provide this service. <br />In order to execute this project in the most cost effective manner, with the most aggressive <br />schedule, Schulke, Bittle & Stoddard, L.L.C. will: <br />Rely on building plans and building department records obtained from the IRC utility <br />department and IRC building department for as -built conditions of the WWTP <br />components. <br />Utilize the IRC utility department standard bid documents and construction contract, <br />which documents shall be provided in an editable format by IRC to SBS. <br />SBS may retain consultant(s) at its discretion, which may include one or more companies <br />whose primary occupation is electrical engineering and wastewater treatment plant <br />design. SBS has budgeted up to $8,500.00 for these services. <br />56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.