My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/15/2018
CBCC
>
Meetings
>
2010's
>
2018
>
05/15/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 2:36:38 PM
Creation date
6/12/2018 3:04:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/15/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANALYSIS: <br />Some, but not all, of the required improvements for Pointe West East Village Phase 2A have been <br />completed. As provided for under the LDRs applicable to this final plat application, the applicant is <br />proposing to "bond -out" for the remaining 10% of required improvements (utilities, roadways, <br />landscape, sidewalks). Public Works, Planning, and Utility Services have reviewed and approved <br />the submitted Engineer's Certified Cost Estimates for the remaining improvements including the <br />final lift of asphalt. The County Attorney's Office has reviewed and approved the submitted <br />Contract for Construction of Required Improvements, and a separate Contract for Construction for <br />the final lift of asphalt along with the posted security. <br />All improvements within Pointe West East Village will be private, with the exception of certain <br />utilities facilities. Those utility facilities will be dedicated to and guaranteed to Indian River County <br />as required through the certificate of completion process and final plat process. In addition, a <br />warranty and maintenance agreement and acceptable security will be required for the roads and <br />stormwater improvements, prior to issuance of a certificate of completion. <br />RECOMMENDATION: <br />Based on the above analysis, staff recommends that the Board of County Commissioners grant final <br />plat approval for Pointe West East Village Phase 2A. <br />ATTACHMENTS: <br />1. Application <br />2. Location Map <br />3. Final Plat Layout <br />4. Contract for Construction of Required Improvements <br />5. Contract for Construction of Final Lift of Asphalt <br />61 <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@740D5A58\@BCL@74OD5A58.rtf 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.