Laserfiche WebLink
EXHIBIT "A" <br />MASTELLER & MOLER. INC. <br />M CIVIL ENGINEERS <br />East Village at Pointe West - Phase 2A 4/3/2018 <br />CERTIFIED COST ESTIMATE <br />FINAL LIFT ASPHALT <br />Description <br />Quantity <br />Unit <br />Unit Price <br />TOTAL <br />Mobilization <br />1 <br />LS <br />$10,000.00 <br />$10,000.00 <br />1" SP 9.5 - 2nd Lift <br />9,398 <br />SY <br />$6.00 <br />$56,388.00 <br />Restripe Pavement <br />1 <br />LS <br />$8,000.00 <br />$8,000.00 <br />Reset PCP's <br />1 J <br />LS <br />$6,000.001 <br />$6,000.00 <br />TOTAL <br />$80,388.00 <br />Sure ISG <br />ty Amount ( 125% ) $100,485.00 I'VVG <br />CERTIFICATE OF COST ESTIMATE <br />I, Stephen E. Moler, a Florida registered engineering, License No. 33193, do hereby certify to Indian River County that this <br />cost estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that <br />the total cost estimate is true and accurate to the best of my knowledge. This estimate has been prepared, in part, to <br />induce approval by the CourA1 � plot for the Pointe West East Village - Phase 2A project, and for the purpose of <br />establishing proper surgIr therewith. <br />No• 33193 <br />Stephen E. Moler, P' 193— "'" <br />Vice President-��t�,S/•.ORIpP:��QQ <br />File#1619 <br />[Final Lift] <br />Copy of PerformanceBondEstimate Phase 2A_18-0419.xtsx <br />1655 27th Street, Suite 2 Page 1 of 1 <br />Vero Beach, Florida 32960 82 <br />(772)567-5300 <br />