My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-092A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-092A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:09:55 PM
Creation date
6/14/2018 3:19:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
05/15/2018
Control Number
2018-092A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting, Inc.
Subject
43rd Avenue Bridge over IRFWCD South Relief Canal Railing Repair
Project Number
1523
Bid Number
2018043
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid No. 2018045/IRC-1523 <br />Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) <br />Timothy Rose Contracting, Inc. <br />and <br />(hereinafter called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual covenants <br />hereinafter set forth, agree as follows: <br />ARTICLE 1 - WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />generally described as follows: <br />PROJECT DESCRIPTION: The project will consist of the complete removal of the existing <br />concrete railing in both directions of the 43" Avenue Bridge over South Relief Canal and installing <br />Thrie Beam Guardrail in its place. Remove posts flush, grind steel down 1" and replace with epoxy. <br />Miscellaneous asphalt around guardrail is to be installed in accordance with the applicable FDOT <br />standard index. A maintenance of traffic plan shall be submitted to the Indian River County Traffic <br />Division by a Florida Licensed Professional Engineer for approval prior to commencing work. <br />Bidder must hold FDOT Prequalification Work Class 13 — Guardrail. <br />ARTICLE 2 -THE PROJECT <br />The Project for which the Work under the Contract Documents may be the whole or only a part is <br />generally described as follows: <br />Project Name: 43RD AVENUE BRIDGE OVER IRFWCD SOUTH RELIEF CANAL RAILING <br />REPAIR (IRC -1523) <br />Bid Number: 2018043 <br />Project Address: 43rd AVENUE, SOUTH RELIEF CANAL, VERO BEACH, FLORIDA 32968 <br />ARTICLE 3 - CONTRACT TIMES <br />3.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for <br />final payment as stated in the specifications are of the essence of the Agreement. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be completed and ready for final payment on or before the 30th day after the date <br />when the Contract Times commence to run. <br />3.03 Liquidated Damages <br />Page 25 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.