My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-092A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-092A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:09:55 PM
Creation date
6/14/2018 3:19:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
05/15/2018
Control Number
2018-092A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting, Inc.
Subject
43rd Avenue Bridge over IRFWCD South Relief Canal Railing Repair
Project Number
1523
Bid Number
2018043
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid No. 2018045/IRC-1523 <br />studies, or data are necessary for the performance of the Work at the Contract Price, within the <br />Contract Times, and in accordance with the other terms and conditions of the Contract <br />Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at <br />the Site that relates to the Work as indicated in the Contract Documents. <br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and data <br />with the Contract Documents. <br />H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies <br />that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof <br />by OWNER is acceptable to CONTRACTOR. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms <br />and conditions for performance and furnishing of the Work. <br />ARTICLE 9 - CONTRACT DOCUMENTS <br />9.01 Contents <br />A. The Contract Documents consist of the following: <br />(1) Invitation to Bid 2018043; <br />(2) CONTRACTOR'S Bid Form (pages 11 to 13, inclusive); <br />(3) Bid Bond (page 14); <br />(4) Drug Free Workplace Form (page 15); <br />(5) Sworn Statement Under Section 105.08, Indian River County Code, on Disclosure of <br />Relationships (pages 16to 17, inclusive); <br />(6) Bidders Qualifications Questionnaire (pages 18 to 21, inclusive); <br />(7) Sworn Statement Under the Florida Trench Safety Act (page 22 to 23, inclusive); <br />(8) List of Subcontractors (page 24); <br />(9) Construction Drawings: Sheet C-1— Cover sheet titled "Railing Retrofit for: 43`d Avenue <br />Bridge over South Relief Canal", B-1 to B-5, - Drawings titled "Railing Retrofit for: 43`d <br />Avenue Bridge over South Relief Canal", FDOTStondord Sheets 400 Guardrail (Sheets 1- <br />26), 470 Traffic Railing — (Thrie Beam Retrofit), General Notes and Details (Sheets 1-3), <br />475 Traffic Railing — (Thrie Beam Retrofit) Wide Curb Type 1 (Sheets 1-4) <br />(10) This Agreement (pages 25 to 32, inclusive); <br />Page 28 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.