My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-092A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-092A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 2:09:55 PM
Creation date
6/14/2018 3:19:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
05/15/2018
Control Number
2018-092A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting, Inc.
Subject
43rd Avenue Bridge over IRFWCD South Relief Canal Railing Repair
Project Number
1523
Bid Number
2018043
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BK: 3121 PG: 1264 <br />PUBLIC CONSTRUCTION BOND <br />Bond No. 9815814 <br />enter bond number) <br />BY THIS BOND, We Timothy Rose Contracting, Inc. ' as Principal and Westfield <br />Insurance Company a corporation, as Surety, are bound to Indian River County <br />, herein called Owner, In the sum of $ 143,431.00 , for payment of which we <br />bind ourselves, our heirs, personal representatives, successors, and assigns, jointly and <br />severally. <br />THE CONDITION OF THIS BOND is that If Principal: <br />1. Performs the contract dated May 15 2018 , between Principal and Owner for <br />construction of 43rd Ave Bridge overt SoutlMelief Canal Railing Repairthe contract being <br />made a part of this bond by reference, at the times and in the manner prescribed in the <br />contract; and <br />2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida <br />Statutes, supplying Principal with labor, materials, or supplies, used directly or indirectly <br />by Principal in the prosecution of the work provided for in the contract; and. <br />3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including <br />appellate proceedings, that Owner sustains because of a default by Principal under the <br />contract; and <br />4. Performs the guarantee of all work and materials furnished under the contract for the <br />time specified in the contract, then this bond is void; otherwise it remains in full force. <br />Any action Instituted by a claimant under this bond for payment must be in accordance <br />with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. <br />Any changes in or under the contract documents and compliance or noncompliance <br />with any formalities connected with the contract or the changes does not affect Surety's <br />obligation under this bond. <br />DATED ON May 15, 2018, <br />00810.3 <br />'y <br />Timothy Rose Contracting, Inc. <br />(Name of Prin I al <br />By <br />Attorney in act C Lord 1 <br />Westfield Insurance Company <br />(Name of Surety) <br />00610 - Public Corwruction Bond <br />F:Wubr)c waYWENQINEERING DIVISION PROJECTSt0225 20th Ave and 16th Sl IntersecUon Improvemen0AdmkftId <br />documentsVA"ar Conhwt DocurnentsNOW10. Pub0c Construction Sond.doc <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />
The URL can be used to link to this page
Your browser does not support the video tag.