My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-013
CBCC
>
Ordinances
>
2010's
>
2018
>
2018-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2018 12:20:54 PM
Creation date
6/19/2018 11:18:59 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2018-013
Adopted Date
06/12/2018
Agenda Item Number
10.A.1.
Ordinance Type
Zoning11/28/201811/28/2018
State Filed Date
06\13\2018
Entity Name
Harmony Reserve LLC
Subject
Rezoning from Residential Single and Multiple Family to Planned Development Residential
Codified or Exempt
Exempt
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 2018- 013 <br />EXHIBIT B <br />Public Benefits of the PD Plan <br />For all PD projects, planning staff asks applicants to identify the public benefits that their <br />proj ect will provide above and beyond conventional development in exchange for the county <br />approving reduced setbacks and other waivers from conventional standards. In this case, the <br />project will provide substantial open space along 33rd Street and 37th Street, dedicate the <br />ultimate right-of-way for 58th Avenue and 33rd Street, provide stormwater capacity for future <br />improvements to adjacent roads, preserve native uplands in excess of LDR requirements, and <br />provide enhanced perimeter buffers. <br />To facilitate joint use of the project's stormwater system, the developer will grant an <br />easement to the county for stormwater purposes. Use of the stormwater system will enable <br />the county to design roadway projects within less right-of-way area, resulting in less right-of- <br />way acquisition impacts on property owners in the future. Details of the easement and <br />stormwater capacity provisions will be addressed through the preliminary PD plan and land <br />development permit processes. <br />In addition to the public benefits described above, the project is designed with internal <br />benefits for project residents, including significant recreational facilities and comprehensive <br />architectural controls. <br />FACommunity Development\CurDev\Ordinances\20180rdinances\2018-_HarmonyReserve.doc 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.