Laserfiche WebLink
Comprehensive Plan <br />Sanita ry Sewer Sub -Element <br />TABLE 3.A.7 - SANITARY SEWER SUB -ELEMENT EVALUATION MATRIX <br />OBJECTIVE #, <br />MEASURE <br />TIMEFRAME <br />1 <br />Availability of Sufficient Capacity <br />Through the time <br />horizon of the plan <br />2 <br />% connected to regional system <br />By 2Q4-52020 <br />3 <br /># of instances of sanitary sewer facilities contaminating <br />surface water or groundwater resources <br />Through the time <br />horizon of the plan <br />4 <br />% of wastewater effluent reused <br />Through the time <br />horizon of the plan <br />5 <br />Completed improvements <br />Through the time <br />horizon of the plan <br />6 <br /># of package treatment plant failures and # of illegal or <br />unsafe package treatment plant discharges <br />Through the time <br />horizon of the plan <br />7 <br /># of new septic t -systems permitted annually <br />By 2020 <br />Appendix A <br />Community Development Department Indian River County 55 <br />