My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-112
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:09:52 PM
Creation date
6/19/2018 4:26:13 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
06/12/2018
Control Number
2018-112
Agenda Item Number
13.A.
Entity Name
Florida Department of Environmental Protection
Subject
Oyster Reef Project
Area
Foot Island
Project Number
Grant Agreement No. S0839
Alternate Name
Amendment No. 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A-1 <br />REVISED GRANT WORK PLAN <br />PROJECT TITLE: Indian River County Oyster Bed Project <br />PROJECT LOCATION: Latitude/ Longitude: 27.651817, -80.371698 <br />PROJECT BACKGROUND: The Indian River Lagoon has more than 2100 species of plants and 2200 <br />species of animals making it North America's most diverse estuary. Indian River County (Grantee) is <br />committed to protecting and preserving the Indian River Lagoon. In the past, the Grantee has successfully <br />established an oyster bed reef in an area adjacent to Spoonbill Marsh in Vero Beach, Florida, which has <br />reduced the amount of total nitrogen (TN) and total phosphorus (TP) entering into the Indian River Lagoon <br />in the area. The Grantee wishes to continue its efforts by constructing a living shoreline/oyster reef along <br />the shoreline of Foot Island. Foot Island is a roughly 2,750 sq. foot island located within Vero Beach, <br />Florida. Evidence of erosion has been observed along the western and southern portions of the island where <br />dead mangroves were exposed, likely due to boat wake and a relatively large fetch. The purpose of the <br />proposed oyster reef would be to a) stabilize the Foot Island shoreline and b) improve water quality <br />conditions of discharges from the adjacent Florida Department of Transportation (FDOT) outfall pipe into <br />the Indian River Lagoon. At this point in time, the project's conceptual design is complete and the Grantee <br />has received permission from the Indian River Board of County Commissioners to proceed with the <br />proposed project. <br />PROJECT DESCRIPTION: The project will require the Grantee to construct living shoreline/oyster reef <br />along much of the Foot Island shoreline with emphasis on the western and southern portions of the island. <br />The southern and western portions of the island are also adjacent to the FDOT outfall pipe. The oyster <br />bags will be stacked to create void spaces throughout the reef structure of differing sizes, dimensions, and <br />openings to the Indian River Lagoon. The proposed oyster reef is approximately 27,500 square feet. The <br />reef location is close enough to the Foot Island that it will not inhibit the navigability of the area. The reef <br />provides a habitat for attached and encrusting organisms such as oysters, and other invertebrates such as <br />stone crabs, juvenile fish species, and game fish species. In turn, the reef will act as an in-situ water <br />treatment system to facilitate the removal of total nitrogen (TN) and total phosphorus (TP) from stormwater <br />discharged through the FDOT outfall into the Indian River Lagoon. The reef is self-perpetuating in that the <br />attached and encrusting invertebrates and turf algae will continue to overgrow any bare areas created in the <br />future. <br />TASKS and DELIVERABLES: <br />Task 1: Construction <br />Task Description: The Grantee will construct an oyster bed reef in accordance with the construction <br />contract documents. <br />Deliverables: Construction completed to date as described in this task, as evidenced by these deliverables: <br />1) Dated color photographs of on-going work representing the time period covered in the payment request; <br />2) signed acceptance and brief description of the completed work to date by the Grantee; 3) written <br />verification that the Grantee has received record drawings and any required final inspection report(s) for <br />the project (as applicable); and 4) signed statement from a Florida Licensed Professional Engineer <br />indicating construction has been completed in accordance with the construction contract documents (as <br />applicable). <br />DEP Agreement No. S0839, Attachment A-1, Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.