My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-116
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:16:19 PM
Creation date
6/22/2018 12:14:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
06/19/2018
Control Number
2018-116
Agenda Item Number
8.K.
Entity Name
Blue Goose Construction
Subject
61st Drive Water Main Replacement
Area
61st Drive
Project Number
47123536-044699-1852
Bid Number
2015001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 2018-003 <br />615` Drive Water Main Replacement <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: June 11, 2018 <br />ATTACHMENT 2 <br />EFFECTIVE DATE: June 19, 2018 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014 <br />PROJECT: 61" Drive Water Main Replacement <br />COUNTY UTILITY PROJECT NO.: UCP N/A CONTRACTOR'S PROJECT NO.: N/A <br />COUNTY WIP. No. 47123536-044699-1852 <br />You are directed to proceed promptly with the following work: <br />Description: Install 6" directional bore to replace failed existing water main along 61" Drive. <br />Method of determining Contract Price: <br />M Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />M Lump Sum <br />0 Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost = <br />$27,775.00 <br />Estimated <br />90 days from NTP <br />Contract Time: <br />ACCEPTED: <br />By: J <br />Blue Goose Construction <br />Labor Contractor <br />G <br />Date: //f Zit <br />RECOM �EDQ: <br />By: <br />John M. Boyer, P. . <br />Utilities Engineer <br />Date: <br />APPROVED: <br />By: / <br />Tndian Ri-,Te-r <br />Peter D. O'Bryan, C <br />O <br />91 <br />U <br />7:1 <br />t~ <br />ro <br />0 <br />U <br />4A <br />O <br />x <br />Q) <br />U <br />2 <br />44 <br />Date: June 19, 218 <br />nn��``��RCOU����" <br />APPROVED AS TO Folk 4R .._-�.,.w <br />AND LEGAL SUFFICIENO <br />BY <br />L')YLANI I EiI,!t ��LCJ <br />COUNTY ATTORNEY <br />F:\Utilities\UTILITY - Engineering\Projects - Capital Projects\18-0516 61stDR WaterRep\Agenda Item\18-0619 WA Approval\Work <br />Authorization No. 2018-003.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.