My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-117
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:16:34 PM
Creation date
6/22/2018 12:50:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
06/19/2018
Control Number
2018-117
Agenda Item Number
8.L.
Entity Name
Blue Goose Construction
Subject
12th Street SW water service replacement
Bid Number
2015001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br />CONSTRUCTION BUDGET - Labor Contract & Direct Purchase <br />Project: 12th Street SW Water Service Replacement <br />(Vero Highlands) <br />By: John M. Boyer, P.E. <br />Date: June 11, 2018 <br />Attachment 2 <br />LABOR COSTS <br />MATERIAL COSTS <br />(IRC Direct Purchase) <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Labor Unit <br />Price <br />Total Labor <br />Price <br />Material Unit <br />Price <br />Total Material <br />Price <br />18k <br />Install Water Service -Double Long with 1" meter and <br />box (more than 50 ft) <br />1 <br />EA <br />$450.00 <br />$450.00 <br />$1,169.70 <br />$1,169.70 <br />181 <br />Install 2" PVC Service Casing <br />1 <br />EA <br />$400.00 <br />$400.00 <br />$25.00 <br />$25.00 <br />181 <br />Install Water Service Double Long with 2" Saddle and <br />Corp Stop at Main (Abandon Existing Service) <br />1 <br />EA. <br />$600.00 <br />$600.00 <br />$26.00 <br />$26.00 <br />26b <br />Install or Replace Existing Service Meters (Connect <br />Customer -Side Plumbing) <br />1 <br />EA <br />$250.00 <br />$250.00 <br />$100.00 <br />$100.00 <br />86a <br />Lawn Restoration (Topsoil & Sod) Includes Watering <br />50 <br />SY <br />$2.25 <br />$112.50 <br />$2.75 <br />$137.50 <br />91 <br />Mobilization, Demobilization, MOT (based on 10% Labor <br />Cost): <br />1 <br />LS <br />$200.00 <br />$200.00 <br />$0.00 <br />$0.00 <br />Subtotals: <br />Labor: <br />$2,012.50 <br />Material: <br />$1,458.20 <br />Contingency: <br />5% <br />$100.63 <br />5% <br />$72.91 <br />Labor: <br />$2,113.13 <br />Material: <br />$1,531.11 <br />TOTAL CONSTRUCTION COST: <br />$3,644.24 <br />FDEP PERMIT FEE: <br />n/r <br />Eng. Design (by Staff): <br />n/r <br />Geotechnical Testing: <br />n/r <br />Stake -Out & As -Built Survey (by Staff): <br />n/r <br />TOTAL PROJECT BUDGET: <br />$3,644.24 <br />F:\Utilities\UTILITY- Engineering\Projects -Capital Projects\18-0521 232512th St SW\Cost Estimate - 12th Street SW.xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.