My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-114A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-114A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:13:20 PM
Creation date
6/25/2018 12:12:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/19/2018
Control Number
2018-114A
Agenda Item Number
8.F.
Entity Name
Morgan and Eklund
Subject
2018 Beach Profile Monitoring Surveys Summer
Hydrographic Surveying
Area
FDEP Range Lines R-15 to R-119
Project Number
Work order number 7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />M&E' <br />Morgan & Eklund. Inc. <br />8745 U.S. Highway 1 Phone: 772-368-5364 <br />P.O. Box 701420 Fax: 772-388-3165 <br />Wabasso, Florida 32970 <br />May 31, 2018 <br />Indian River County <br />Attn: Mr. James Gray, Jr. <br />Coastal Engineer <br />180127 1h Street, Building A <br />Vero Beach, Fl, 32960 <br />RE: Summer 2018 Indian River County Coastal Monitoring Survey; Onshore/Offshore <br />Profiles along FDEP Range Lines R-15 to R-119 (105 Lines) <br />Dear James: <br />Morgan & Eklund, Inc. is pleased to provide you with the following proposal to furnish <br />professional land and hydrographic survey services for the above referenced project. <br />Beach profiles will include R-15 through R-119, a total of 105 (one hundred five) beach profile <br />lines. All data collected will be in accordance with the FDEP-approved Physical Monitoring <br />Plan. Morgan & Eklund, Inc. will provide the County with beach profile data in ASCII file <br />format together with AutoCAD drawings signed by the surveyor. The survey will be performed <br />in July 2018 with drawings and reports completed in August 2018. <br />Additionally, the landward occurrence of rock outcroppings will be identified along each profile <br />line. <br />In accordance with the scope of work as provided, l estimate our costs to be as follows: <br />I. Summer 2018 Sector 3 Beach and Dune Restoration Project Post Construction <br />Monitoring Survey (R-15 to R-60) <br />46 Onshore/offshore <br />profile lines @ $550/line......................................$ 25,300.00 <br />II. Summer 2018 Sector 7 Post Construction Monitoring (R-97 to R-108) <br />12 Onshore/Offshore <br />profile lines @ $550/line.....................................$ 6,600.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.