Roseland Community Center <br />Project # 17-0201 <br />August 15, 2017 <br />Exterior Findings: <br />• MBV Engineering, Inc. performed an exterior elevation survey at the south side of the <br />structure to determine current ADA compliance with the sidewalk slopes and to determine <br />the current nature in which water drains in this area. <br />• The stairs to the west of the structure are currently out of level and the risers are not within <br />code tolerances. <br />• A block structure hiding a water system was found on the west side of the structure between <br />the stairs and the western wall. This system being on the exterior of the building with no <br />entry door and no permanent roof is not code compliant. <br />6. Proposed Repairs <br />The following is recommended for proper repair: <br />Roofing System: <br />• MBV Engineering, Inc. proposes an entire reroof be performed. The Florida Building Code — <br />Existing Building section 706.1.1 states, "Not more than 25 percent of the total roof area or <br />roof section of any existing building or structure shall be repaired, replaced or recovered in <br />any 12 -month period unless the entire existing roofing system or roof section is replaced to <br />conform to requirements of this code." MBV Engineering, Inc. believes the amount of <br />damages to the members and sheathing will encompass more than 25% of the roof area and <br />due to this an entire reroof is necessary. Where marked on the plans roof sheathing needs to <br />be replaced and nailed per the schedule on sheet S3 in Appendix B. We recommend keeping <br />the same type of roofing systems on the different areas. Roofing materials shall be installed <br />in accordance with current code requirements. <br />Floor System: <br />• All rotted floor framing components shall be removed and replaced with new code compliant <br />members. All floor sheathing in these areas shall also be removed and replaced appropriately. <br />In order to have full access a great portion of the sheathing will have to be removed. <br />• Shims need to be installed at the locations noted on the plans in Appendix A. <br />• While the drywall is removed from the interior walls MBV Engineering, Inc. recommends <br />jacking up the structure to bring the interior floor slopes within 0.5% slope. MBV <br />Engineering, Inc. recommends bringing the structure up until no point is less than 1.25 inches <br />beneath the zero set during the original investigation. The areas which need to be lifted are <br />marked on the plans seen on sheet S6 in Appendix B. <br />Windows: <br />• All windows need to be resealed or remounted to ensure no future leaks occur in the <br />structure. <br />• Window trims need to be removed and replaced accordingly. <br />• The masonry cracks in the window wells need to be properly sealed to prevent moisture from <br />intruding into the structure. <br />• The window with the broken muntin needs to be properly repaired or replaced. <br />• A new screen needs to be installed at the window marked on the plans. <br />