Laserfiche WebLink
ROOF SHEATHING FASTENING SCHEDULE WITH 19/32" PLYWOOD <br />SPACING REQUIRED FOR 8d COMMON NAILS <br />BUILDING <br />ZONE 1 <br />ZONE 2 <br />ZONE 3 <br />6" O.C. @ EDGES <br />3" O.C. @ EDGES <br />3" O.C. @ EDGES <br />ENCLOSED <br />6" O.C. @ FIELD <br />6" O.C. @ FIELD <br />6" O.C. @ FIELD <br />DESIGN PRESSURE <br />-30 PSF <br />-68 PSF <br />-93 PSF <br />ALLOWABLE <br />DESIGN PRESSURE <br />-49 PSF <br />-113 PSF <br />-ISS PSF <br />ULTIMATE <br />a = 4 FEET EDGE DISTANCE <br />a <br />a <br />_= 3 <br />O 12 <br />I <br />�I <br />2 <br />ROOF ZONES NORTH <br />1835 - 20TH STREET JOB NO. 17-01 <br />cjw <br />STRUCTURAL VERO BEACH, FL 32960 DESIGNED <br />PH. (772) 569-0035 DRRAAWWAER <br />N AER <br />INSPECTION ROOF ZONES -MBV FX. (772) 778-3617 DATE AUG 2017 <br />1297383rd AVENUE ENGINEERING, INC. CHECKED RV <br />MOIA BOWLS VILLAMIZAAR&ASSOCIATES MELBOURNE FL- PH (321) 253. 15 10 DA TE ISSUED <br />SEBASTIAN, FL CONSULTINGENGINEERING CA#3728 Fr. PIERCE FL-PH(M)a689055 SHEET 3 OF 7 <br />3 <br />2_, <br />3 <br />2 <br />3 <br />II <br />II <br />II <br />II <br />II <br />II <br />II <br />3 <br />