My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/19/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
06/19/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2018 10:12:56 AM
Creation date
6/25/2018 2:48:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Handouts
Meeting Date
06/19/2018
Meeting Body
Board of County Commissioners
Subject
Roseland Community Center
Structural improvements and rehabilitation
Application for Division of Historic Resources special category grant
Document Relationships
06/19/2018
(Cover Page)
Path:
\Meetings\2010's\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MBV ENGINEERING, INC. <br />PROJECT 17-0201 <br />ROSELAND COMMUNITY CENTER <br />ESTIMATED REPAIR COST <br />Item <br />Cost <br />A. Exterior Site: <br />1. Remove and replace wooden stairs, 44" in height <br />$ <br />4,000.00 <br />2. Level parking area <br />$ <br />1,500.00 <br />3. Install block retaining wall around parking area <br />$ <br />12,000.00 <br />4. Remove ramp and sidewalk <br />$ <br />9,000.00 <br />5. Add new sidewalk <br />$ <br />28,000.00 <br />6. Add control structure for stormwater and piping <br />$ <br />7,000.00 <br />Exterior Site Subtotal <br />$ <br />61,500.00 <br />B. Exterior Structure: <br />1. Repaint structure on lap siding elevations <br />$ <br />5,000.00 <br />2. Remove and replace window trim (wood walls) <br />$ <br />2,000.00 <br />3. Replace damaged siding <br />$ <br />15,000.00 <br />4. All roofing <br />$ <br />45,000.00 <br />5. Repair masonry cracks <br />$ <br />600.00 <br />6. Add entry and roof to water tank enclosure <br />$ <br />5,000.00 <br />7. Doors and Windows replacement <br />$ <br />22,000.00 <br />8. Rotted Wood Pier, Remove and Replace <br />$ <br />4,000.00 <br />9. Rotted 6 x 6, Remove and replace <br />$ <br />4,000.00 <br />10. Rotted rafters, Remove and replace <br />$ <br />6,000.00 <br />11. Floor sheathing, Remove and replace <br />$ <br />2,000.00 <br />Exterior Structure Subtotal <br />$ <br />110,600.00 <br />C. Interior Structure: <br />1. Flooring Replacement <br />$ <br />15,000.00 <br />2. Drywall Replacement <br />$ <br />8,000.00 <br />3. Missing wall Insulation <br />$ <br />2,000.00 <br />4. Missing Floor Insulation <br />$ <br />1,600.00 <br />5. Remove moisture damaged ceiling finishes <br />$ <br />5,000.00 <br />6. Remove and replace headers <br />$ <br />4,000.00 <br />7. Retrofit or rebuild north gable end wall <br />$ <br />10,000.00 <br />8. Lift Structure <br />$ <br />5,000.00 <br />Interior Structure Subtotal <br />$ <br />50,600.00 <br />Overall Subtotal $ 222,700.00 <br />Contingency 15% $ 33,405.00 <br />Engineering 7.5 % $ 19,207.88 <br />TOTAL BUDGET <br />$ 275,312.88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.