My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-125
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:46:04 PM
Creation date
7/5/2018 9:58:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/03/2018
Control Number
2018-125
Agenda Item Number
8.H.
Entity Name
Aptim Environmental & Infrastructure
Subject
Beach and Dune Renourishment
Area
Wabasso Beach and Dune Restoration project
Project Number
2018006-3
Alternate Name
Sector 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 <br />William Reilly, P.E. <br />Senior Coastal Engineer <br />APTIM <br />9143 Philips Hwy, Suite 400 <br />Jacksonville, FL 32256 <br />• Camera Calibration Report. <br />• Flight Reports, including Flight Log, Weather Log, and Tide Log. <br />• FGDC Compliant Metadata in HTML format. <br />SCHEDULE <br />Aerial Imagery Flight Mission: One week from NTP, weather permitting. <br />Delivery of Raster Imagery will be within 12 weeks from flight date. <br />FEES <br />Lump Sum (Total Fee)...............................................................................$ 19,224.00 <br />R-15 to R-60: <br />I Indian River County Sector 3 <br />Classification <br />Hourly Rate <br />overhead Multiplier with 10% profit <br />Billable Rate <br />Hours <br />Total <br />Project Manager <br />556.00 <br />3.00 <br />$168.DO <br />20 <br />S3,36D.00 <br />Project Surveyor/C)A/QC <br />$53.OD <br />3.00 <br />$159.0 <br />8 <br />$1.272.00 <br />Surveyor/Aerial Triangulation <br />$45.0 <br />3.00 <br />$135.DO <br />18 <br />52,430.0 <br />CADDTcch/tmageClipping <br />526.00 <br />3.00 <br />$78.DD <br />45 <br />$351.D0 <br />DRho Analyst <br />$33.0D <br />3.00 <br />$99.00 <br />55 <br />SS,445;00 <br />Pilot <br />$3850 <br />3.00 <br />$115.50 <br />5 <br />'SS7750 <br />Subtotal <br />R-1 to R-15 and R-60 to R-119: <br />Classification <br />Hourly Rate <br />Overhead Multiplier with 10% profit <br />Billable Rate <br />Hours <br />Total <br />Project Manager <br />$56.00 <br />3.00 <br />$168.00 <br />4 <br />$672.00 <br />Project5urveyor/QA/QC <br />$53.00 <br />3.00 <br />' 2 <br />$318.00 <br />Surveyor/Aerial Triangulation <br />$45.00 <br />3.00. <br />_$159.00 <br />$135.00 <br />6 <br />$810.00 <br />CADDTech/image Clipping <br />$26.00 <br />3.00 <br />$73.00 <br />2 <br />$156.00 <br />Ortho Analyst _. <br />$33.00 <br />3.00 _.._ <br />...... $99.00 <br />35 <br />$3.465.00 <br />Pilot <br />$3850 <br />3.00 <br />$115.50 <br />0.25 <br />$28.88 <br />_ <br />Sensor Operator <br />$2150 <br />_ <br />3.00 <br />_ <br />$5450 <br />0.25 <br />$16.13 <br />Subtotal <br />$5,466.00 <br />CONTRACT TERMS <br />Time for Acceptance <br />This proposal may be accepted only if it is signed and received by GPI GEOSPATIAL within <br />ninety (90) days from the date of the proposal. . <br />GPI Geospatial. Inc. 423 South Keller Road, Suite 300 Orlando, FL 32810 p 407.851.7880 <br />µ:s CGUC: C' .-'. _'r' ..ori �_v Ei-n : river . <br />
The URL can be used to link to this page
Your browser does not support the video tag.