My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-125
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:46:04 PM
Creation date
7/5/2018 9:58:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/03/2018
Control Number
2018-125
Agenda Item Number
8.H.
Entity Name
Aptim Environmental & Infrastructure
Subject
Beach and Dune Renourishment
Area
Wabasso Beach and Dune Restoration project
Project Number
2018006-3
Alternate Name
Sector 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)>11 <br />F <br />APTIM <br />June 8, 2018 <br />Mr. lames Gray <br />Director of Natural Resources <br />Indian River County Public Works <br />180127th St, Building A <br />Vero Beach, FL 32960 <br />Subject: Indian River County, FL <br />Sector 3 — 2018006 — Work Order #3 <br />2018 Physical Monitoring <br />Dear James: <br />Aptim Environmental & Infrastructure, Inc. <br />2481 NW Boca Raton Blvd. <br />Boca Raton, FL 33431 <br />Tel: +1 561 391 8102 <br />Fax: +1 561 391 9116 <br />www.aptim.com <br />This proposal outlines a scope of work for Aptim Environmental & Infrastructure, Inc. (APTIM) to provide <br />professional services to Indian River County (the County) in support of permit -required physical monitoring efforts <br />for the Indian River County Sector 3 Dune Repair Project constructed in 2014/15 (FDEP Permit No. 0285993 -001 - <br />JC; currently Mod 008 -JN). Physical monitoring for the initial Sector 3 Beach & Dune Restoration Project <br />constructed between 2010 and 2012 has been fulfilled and is no longer required per correspondence with FDEP <br />dated October 25, 2017. The 2018 physical monitoring represents the Year 3 condition of the 2014/15 Dune <br />Repair Project (1124 - R55) and includes beach profile surveys, aerial photography, and report development. <br />Physical monitoring is required at least 5,000 feet north and south of the project area. Additionally, as requested <br />by the County, this proposal includes collection of aerial photography along the remaining portion of the Indian <br />River County shoreline, to be conducted in conjunction with the Sector 3 aerial photography collection. The costs <br />associated with this work order were developed following the provisions of the Professional Services Agreement <br />between Indian River County and APTIM, dated January 9, 2018, to provide engineering and biological support <br />services for the Sector 3 (Wabasso Beach) Beach and Dune Renourishment Project (RFQ#2018006). <br />Task 1: Physical Monitoring Report <br />Task 1: Scope of Work <br />We understand that the County's surveyor, Morgan & Eklund, will perform the beach profile surveying and will be <br />responsible for certifying the survey data and submitting a survey report to the FDEP. APTIM will review the data <br />to ensure that it conforms to the standards required by the FDEP physical monitoring plan. APTIM will notify the <br />County of any issues with the survey data and will coordinate through the County or directly with the surveyor to <br />resolve any issues. <br />APTIM will develop an engineering report that discusses the performance of the beach fill project. We will analyze <br />contour (MHWL and dune) and volumetric changes throughout the project area for erosion and accretion <br />patterns, trends or changes between annual surveys and for cumulative changes overtime. Summary tables and <br />graphical representations of contour and volumetric changes will be presented, as well as beach profile plots of <br />the current and previous monitoring surveys. <br />APTIM will manage the collection of georeferenced aerial photography of the project area, as discussed more fully <br />in Task 2. The aerials will be collected between R-15 and R-60, as to align with previous aerial photography <br />collection related to this project. Plots of relevant hardbottom and shoreline positions will be overlaid on the <br />Sector 3 — 2018006— WON12018 Physical Monitoring Proj. # 631237709 <br />
The URL can be used to link to this page
Your browser does not support the video tag.