My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-125
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:46:04 PM
Creation date
7/5/2018 9:58:17 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/03/2018
Control Number
2018-125
Agenda Item Number
8.H.
Entity Name
Aptim Environmental & Infrastructure
Subject
Beach and Dune Renourishment
Area
Wabasso Beach and Dune Restoration project
Project Number
2018006-3
Alternate Name
Sector 3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
„,A, APTIM <br />June 8, 2018 <br />Page 3 of 4 <br />Task 2: Deliverable <br />The following deliverables will be provided to the County (Entire County aerials — Task 2.A) and FDEP (Sector 3 <br />aerials —Task 2.b) via secure file transfer or thumb drive, whichever the County/FDEP prefers: <br />1. Camera Calibration Report <br />2. Flight Report — includes Flight Log, Weather Log, and Tide Log <br />3. MetaData — Federal Geographic Data Committee (FGDC) compliant in HTML format <br />4. Individual georeferenced orthorectified image frames in uncompressed TIFF format and associated <br />world files <br />5. Mosaicked georeferenced orthorectified image in JPEG format and associated world file <br />Task 2: Schedule <br />Collection of the aerial photography will be timed to occur as close to concurrent as possible with the beach profile <br />surveying conducted for Sector 3. The exact time of beach profile survey collection is unknown, but it is expected <br />in mid-July 2018. APTIM will coordinate with GPI, the County, and/or Morgan & Eklund to align the schedule as <br />close as possible. The Sector 3 aerials (Task 2.A) will be collected in conjunction with the Entire County aerials <br />(Task 2.13). <br />Task 2: Cost <br />The lump sum cost for Task 2 is $20,185.20, including a 5% management fee for subcontractors, per the <br />Professional Services Agreement between the County and APTIM. The cost associated with each aerial collection <br />effort is as follows: <br />Task 2.A: Sector 3 <br />$14,445.90, including a 5% management fee for subcontractors <br />Task 2.13: Entire County.lexcludine Sector 3) <br />$5,739.30, including a 5% management fee for subcontractors <br />Summary <br />The total lump sum cost to perform the proposed work described herein for Sector 3 — 2018006 — Work Order #3 <br />is $49,719.20. The following page includes a summary of the costs and labor hours of each Task. Thank you for <br />the opportunity to serve Indian River County. As always, please do not hesitate to call if you have any questions. <br />Sincerely, <br />William Reilly, P.E. <br />Senior Coastal Engineer <br />Aptim Environmental & Infrastructure, Inc. <br />cc: Thomas Pierro, P.E., D.CE, APTIM <br />Debbie Neese, APTIM <br />:'�j ” F'Q <br />Authorized Corporate Signature <br />Thomas P. Pierro, P.E., D.CE <br />Printed Name <br />Director of Operations <br />Title <br />Sector 3 —2018006 — WO#3: 2018 Physical Monitoring Proj. #631237709 <br />
The URL can be used to link to this page
Your browser does not support the video tag.