My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-126
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:48:44 PM
Creation date
7/5/2018 10:13:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/03/2018
Control Number
2018-126
Agenda Item Number
12.G.3.
Entity Name
All Webbs Enterprises
Kimley Horn and Associates
Subject
Well Deepening
Area
South County Reverse Osmosis Plant
Project Number
CCNA2018 Work Order 3
Alternate Name
Floridan Well Deepening and Performance Improvement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consultant will attend meetings and make onsite site visits for each of the four (4) <br />existing wells to be deepened; provide coordination during construction, review of <br />individual well geophysical and video logging,, review contractor's submittals <br />including acid treatment plan, onsite hydrogeologic observation during critical <br />elements of deepening, well logging. <br />Consultant will prepare four (4) copies of a hydrogeologic technical memorandum for <br />rehabilitation of each well summarizing the results of these modifications. <br />KHA will prepare a well completion report for the deepened wells #2, 3, 5 and 6, <br />including a summary of the lithologic logs, field logs, hydrologic and water quality <br />data, and preparation of figures, data, lithogic logs, and appropriate attachments. <br />It is anticipated that the additional construction phase that will be added will be up to <br />380 calendar days from notice to proceed with the deepening scope to final completion. <br />The re -installation of the well pump, column piping, and electrical service for the <br />deepened wells is assumed to be included under the drilling and rehabilitation phase. <br />Consultant will attend up to four (4) onsite progress meetings to discuss progress, <br />review construction related issues, and provide coordination where needed. <br />It is assumed that NO FDEP permitting will be required since the size of the well casing, <br />and capacity of the wellpump will not change. The Contractor will provide the <br />SJRWMD well construction and well completion reports. <br />TASK 3 - SUMMARY TECHNICAL REPORT <br />Consultant will prepare a summary technical report for the deepening of four (4) Floridan <br />aquifer production wells, and submit DRAFT versions to IRCU staff for review. <br />Consultant will submit final copies to IRCU and include comments from IRCU staff. <br />SCHEDULE <br />In general, the schedule will coincide with the Contractor's (AWE) schedule and <br />consultant will work expeditiously to meet it: <br />Task 1, 2 Construction Observation 380 days from AWE Completion Date <br />Task 3 Prepare Tech Memo 6 - 8 weeks after Contractor Substantial <br />completion <br />FEESCHEDULE <br />kAWl1[3_Civil\044572039 - SCRO Well S-4 Replacement\Deepening\IRCU Floridan Well Deepening Scope - IRCU 6.11.18.docxPage 3 of4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.