My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-126
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:48:44 PM
Creation date
7/5/2018 10:13:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/03/2018
Control Number
2018-126
Agenda Item Number
12.G.3.
Entity Name
All Webbs Enterprises
Kimley Horn and Associates
Subject
Well Deepening
Area
South County Reverse Osmosis Plant
Project Number
CCNA2018 Work Order 3
Alternate Name
Floridan Well Deepening and Performance Improvement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Proposal for Indian River County South WTP Including Deepening of Wells S-2, S-311, S-5, S-6 and Acid <br />Treatment of Well S-2 <br />Item <br />Description <br />UOM <br />Unit Rate <br />Qty. <br />Total <br />1 <br />Additional Bonds and Insurance for Deepening Work (4 Wells) <br />LS <br />$22,500 <br />1 <br />$22,500 <br />2 <br />S-6 Drilling Rig Mobilization and Demobilization including Electrical <br />LS <br />$99,214 <br />1 <br />$99,214 <br />3 <br />S-3 Drilling Rig Mobilization and Demobilization including Electrical <br />LS <br />$69,575 <br />1 <br />$69,575 <br />4 <br />S-5 Drilling Rig Mobilization and Demobilization including Electrical <br />LS <br />$73,214 <br />1 <br />$73,214 <br />5 <br />S-2 Drilling Rig Mobilization and Demobilization including Electrical <br />LS <br />$70,507 <br />1 <br />$70,507 <br />6 <br />Complete Removal and Re -installation of Pump Discharge Apparatus with Disinfection (S-2) <br />EA <br />$15,000 <br />1 <br />$15,000 <br />7 <br />lGeophysical Logging (Complete Set) (S-2) <br />EA <br />$8,500 <br />1 <br />$8,500 <br />8 <br />Perform Complete Video Log (Initial) (5-2) <br />EA 1 <br />$3,500 <br />1 <br />$3,500 <br />9 <br />Complete Setup and Removal for Acidization Including Removal of Spent Acid (S-2) <br />EA <br />$7,900 <br />1 <br />$7,900 <br />10 <br />Well Acidization (S-2) <br />EA <br />$4.50 <br />4,000 <br />$18,000 <br />11 <br />Pump Develop Well (S-2) <br />HR <br />$250 <br />60 <br />$15,000 <br />12 <br />Conduct Step Drawdown Test (4 Wells) <br />EA <br />$3,000 <br />4 <br />$12,000 <br />13 <br />Perform Complete Video Log (Final) (S-2) <br />EA 1 <br />$2,000 <br />1 <br />$2,000 <br />14 <br />Formation Water Disposal (S-2) <br />EA <br />$10,000 <br />1 <br />$10,000 <br />15 <br />Perform Site Restoration ( Crushed Concrete Temporary Pad Removal) <br />EA <br />$8,500 <br />4 <br />$34,000 <br />16 <br />Drill Nominal 15 -inch Borehole (Each Well to 850 ft, Total 4 Wells) <br />FT <br />$110 <br />595 <br />$65,450 <br />17 <br />Well Maintenance Contingency Allowance (S-2) <br />EA <br />$20,000 <br />1 <br />$20,000 <br />18 <br />Additional Bacterialogical Sampling and Analysis (8 Additional Samples per Well) <br />EA <br />$150 <br />32 <br />$4,800 <br />TOTAL <br />$551,160 <br />Additonal Contract Time: 380 Calendar Days <br />Estimated Completion Date: December 18, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.