Laserfiche WebLink
PHASE 4: Community Arts Building <br />Phase 4 includes the development of a Community Arts Building, which is proposed as a 5,000 square <br />foot structure. The projected costs under this phase include construction of the building and associated <br />utility connections. The approximate phase cost ranges from $1,768,000 to $2,090,000. <br />j <br />0011c10 I t <br />COMMUNITY ARTS BUILDING <br />L L <br />PHASE 5: Amphitheater <br />Phase 5 includes the construction of an amphitheater, the expansion of the paved parking lots along the <br />northern side of the site, and the installation of a stormwater retention pond along the western side of <br />the site. The stage building structure for the amphitheater will also include additional public restrooms. <br />The approximate cost for this phase ranges from $3,965,000 to $4,686,000. <br />liimmmme�mrp—nmmwiaimnry��mwmmmmu p� �—;^•i,._-{ / "^- <br />I; L L <br />I ► ` ` — t;:,-� � � Win.-�"J , t <br />AMPHITHEATER (WITH RESTROOMS. <br />CONCESSIONS. AND PARKING) <br />STORMWATER RETENTION POND I <br />Gifford Landfill Redevelopment Plan Staff Report.docm <br />233 <br />Page 4 of 6 <br />