My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/05/2018
CBCC
>
Meetings
>
2010's
>
2018
>
06/05/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 1:30:56 PM
Creation date
7/17/2018 1:39:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/05/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka P.E., Public Works Director <br />FROM: Keith McCully, P.E., Stormwater Engineer AW <br />SUBJECT: Recommendation of Award of Contract for Replacement of Conveyor Systems <br />at the PC Main Screening System (Bid No. 2018055) <br />DATE: May 15, 2018 <br />DESCRIPTION AND CONDITIONS <br />PC Main Screening System has two conveyor systems that transport debris collected by self-cleaning <br />trash rakes to a collection pad. The conveyors are approximately ten years old and have begun to fail <br />with increasing frequency. If a catastrophic failure occurs with Conveyor System No. 1, the facility will <br />be rendered useless. Complete failure of Conveyor System No. 2 is less critical, but would produce <br />significant operational difficulties. Therefore, bids to replace both conveyor systems were advertised on <br />April 1, 2018 and bids were received on May 3, 2018. Two potential bidders visited the site and only a <br />single bid (from Costello Brothers Marine Construction, Inc.) was received. <br />The Costello Brothers Marine Construction, Inc. (Costello) bid amount was $671,186.60. The bid <br />contained what staff believed to be unusually high removal and disposal costs for the two existing <br />conveyor systems. Purchasing Division contacted Costello to request clarification on the two line items <br />for removal and disposal. Costello noted it made a mistake in the bid, wherein the amount to remove <br />and dispose both existing conveyor systems was inserted in the bid line item for each system, rather than <br />one-half the amount in each line item. On May 14, 2018, Costello submitted a corrected bid form, an <br />explanation of the error, and a summary of the removal/disposal breakdown. The new bid amount is <br />$586,236.60 which staff believes is reasonable. <br />FUNDING <br />Funding is budgeted and available from Account No. 31524338-066510-16001 (Optional Sales Tax <br />Funds/Public Works/PC Main Relief Canal Upgrade). <br />RECOMMENDATION <br />Staff recommends the Board accept Costello's modification to its bid and award to the lowest <br />responsive and responsible bidder, Costello Brothers Marine Construction, Inc., for $586,236.60. Staff <br />further recommends the Board authorize the Chairman to execute the agreement upon review and <br />approval of both the agreement and required public construction bond by the County Attorney as to <br />form and legal sufficiency, and the receipt and approval of required insurance by the Risk Manager. <br />113 <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@C0015993\@BCL@C0015993.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.