My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/05/2018
CBCC
>
Meetings
>
2010's
>
2018
>
06/05/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 1:30:56 PM
Creation date
7/17/2018 1:39:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/05/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: May 22, 2018 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services <br />Prepared By: John M. Boyer, P.E., Utilities Engineer <br />Subject: Forest Park Water Main Extension: Approval of Change Order and Final Pay for <br />Blue Goose Construction Work Authorization No. 2017-008 <br />DESCRIPTIONS AND CONDITIONS: <br />During the October 3, 2017, meeting, the Board of County Commissioners (BCC) approved Work <br />Authorization (WA) 2017-008 for Blue Goose Construction (Contractor) to extend a water main into the <br />Forest Park community. The project is complete, and the Contractor has submitted a change order and <br />final pay request. <br />ANALYSIS: <br />During construction certain line items were either increased or added to the project, and other line items <br />were either reduced or deleted from the project. The net result is a reduction in both labor and material <br />costs. Project costs are summarized in the table below: <br />Change Order#1(attached) reduces the Labor Expense to the amount shown above. The amount due the <br />contractor for the final pay request (see attached) is $5,169.41, which includes contractor -purchased <br />material. <br />117 <br />Original <br />Approval <br />Additions or <br />(Deductions) <br />Final Cost <br />1— Labor Expense: <br />$ 74,920.78 <br />$(14,532.38) <br />$ 60,388.40 <br />2 — IRC Direct Purchase Materials: <br />$ 20,026.60 <br />$(10,064.51) <br />$ 9,962.09 <br />3 — Contractor Purchased Materials: <br />- - <br />$ 3,827.06 <br />$3,827.06 <br />4—Miscellaneous Expenses <br />including Survey <br />$ 7,650.00 <br />$ 4,914.88 <br />$ 12,564.88 <br />Totals: <br />$102,597.38 <br />$(15,854.95) <br />$ 86,742.43 <br />Change Order#1(attached) reduces the Labor Expense to the amount shown above. The amount due the <br />contractor for the final pay request (see attached) is $5,169.41, which includes contractor -purchased <br />material. <br />117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.