My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/05/2018
CBCC
>
Meetings
>
2010's
>
2018
>
06/05/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 1:30:56 PM
Creation date
7/17/2018 1:39:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/05/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
381
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: May 30, 2018 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services <br />Prepared By: John M. Boyer, P.E., Utilities Engineer <br />Subject: 128th Court Water Main Extension: Approval of Change Order and Final Payment <br />of Blue Goose Construction Work Authorization No. 2018-001 <br />DESCRIPTION AND CONDITIONS: <br />County residents approached the Indian River County Department of Utilities Services (IRCDUS) and <br />requested that the County water system be extended to serve their properties. These residents entered into <br />a "complex connection" agreement with IRCDUS and paid a deposit for the design and construction of the <br />water main extension. <br />The resident's cost was based on the construction of a 4" water main, which would be the minimum pipe <br />size for this application. However, staff also considered the provision of fire protection and phase 2 of the <br />future North County Septic to Sewer project, which will include the construction of 6" water main in the <br />subject neighborhood. Staff therefore decided to construct a 6" water main. <br />Thus, during the January 23, 2018, meeting, the Board of County Commissioners (BCC) approved Work <br />Authorization (WA) 2018-001 for Blue Goose Construction (Contractor) to construct water mains along <br />128th Court, 82nd Court, and 83rd Avenue in Roseland. The project is complete, and the Contractor has <br />submitted a final pay request. <br />ANALYSIS: <br />During construction, alternate materials were used for certain line items, and quantities reduced for other <br />certain line items. The contingency amount has also been deducted for the final pay request. The changes <br />are described in Change Order No. 1. <br />126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.