Laserfiche WebLink
($80) per square foot of dwelling space, excluding septic tank, well, or <br />water/sewer hook-ups, which is less than the cost of new construction and will be <br />assumed to meet the cost/value limit. <br />N. Clearance <br />Requirements are identified by the HRS and are included in the replacement unit <br />bid package. In this way, the same Contractor is responsible for site cleanup and <br />preparation as for provision of the replacement unit. Disposal of debris and <br />associated activities are also included if this method is utilized. When demolition <br />or clearance is conducted separately, bid packages are prepared with <br />procedures following those identified for rehabilitation in this manual. <br />O. Rehabilitation/ Demolition Differences <br />A major difference between assistance provided to demolish / replace an entire <br />unit and rehabilitation work is that, with a demo / replace unit, the DPL issued is <br />not for the full value of the replacement unit (owner occupied). (With <br />rehabilitation, the DPL is issued for the full value of the rehab work performed.) <br />The value of the DPL is based on a calculation that takes the difference between <br />the assessed value of the original unit (real property not included) and the actual <br />cost of the new unit (without real property). The difference is the value of the <br />DPL. This is because the dilapidated unit that was demolished belonged to the <br />Applicant homeowner and is being replaced on a one-for-one basis. Ownership <br />of the replacement unit is vested directly to the homeowner with no interest on <br />the part of the local government (except for the DPL). Generally, the local <br />government will accept interim ownership of mobile homes to save program <br />costs (taxes) with transfer to the homeowner as soon as possible, upon <br />satisfaction of the DPL. <br />No partial payment is provided for modular replacement units, as the time <br />frame to complete the transaction is relatively brief. The Contractor is paid in <br />full upon satisfactory completion of work and providing of warranties. Partial <br />payments are utilized for site built homes along the same lines as for <br />rehabilitation work. <br />2. Program disbursements are made from the local CDBG operating account. <br />As a result, attention must be paid to the ordering and receipt of funds, to <br />ensure that disbursements are made in a timely manner and that the <br />CDBG/DRI limitation for cash on hand is not violated. <br />3. Rehabilitation cost feasibility limits are based on number of bedrooms to be <br />provided for site built homes. These limits may not be exceeded without <br />approval from the County Commission are: <br />a. four or more bedrooms - $80,000 CDBG/DRI <br />b. three bedrooms - $70,000 CDBG/DRI <br />c. two bedrooms - $60,000 <br />4.5 <br />