My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-128A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-128A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 12:52:10 PM
Creation date
8/3/2018 2:01:26 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
07/10/2018
Control Number
2018-128A
Agenda Item Number
10.A.1.
Entity Name
Department of Economic Opportunity (DEO)
Subject
Community Development Block Grant (CDBG), Housing Assistance Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for rehabilitation and 90 - 180 days for replacement or redevelopment) begins <br />with issuance of the Notice to Proceed. The HRS shall recommend the <br />appropriate contract period based on the type, size and complexity of the work. <br />R. Construction Progress Inspections <br />Periodic inspections of the rehabilitation construction are performed by the <br />County and the HRS throughout the contract period. These inspections are <br />conducted to assure compliance with the contract standards for workmanship <br />and materials, to detect any unauthorized deviations and to identify necessary <br />changes to the contract work in its early stages. <br />Inspection and approval of completed work must be conducted by the HRS prior <br />to the contractor receiving partial or final payment. The Applicant homeowner's <br />acceptance of the work is also required before payment is received. No final <br />payments will be issued until the County Building Department issues a Certificate <br />of Completion or Certificate of Occupancy and all lien wavers are collected and <br />cleared. <br />S. Change Orders <br />Any additions to, deletions from, or changes in the rehabilitation contract work, <br />time, or price must be approved in a written Change Order before the additional <br />work is started. The Change Order may be executed by the Applicant <br />homeowner and contractor and is approved by the HRS and the PA. All change <br />orders must be approved by the PA and the HRS. Change orders may also be <br />issued to correct code deficiencies, or to obtain any other desired change in the <br />work. CDBG funds can only be for Change Orders that correct code violations as <br />documented by the local building department, a bonafide code violation report, <br />time, or to meet Section 8 HQS found after rehabilitation begins. <br />For CDBG and DRI categories, additional non -code -related changes will be at <br />the Applicant homeowner's expense. <br />T. Payment <br />Contractor payments are to be consistent with local policy, unless otherwise <br />approved by the County and the funding agency as allowable by all applicable <br />regulations. Specific payment policy depends on the program, and the type and <br />amount of assistance being provided and the contract awarded. <br />There will be NO payments shall not be processed without proper signatures <br />from the owner, the contractor, the HRs, and the PA. Also no payments shall be <br />processed without completed primary and subcontractor lien waivers as <br />applicable to the contract award or as required by the local policy. <br />Contractor Payment request and submissions should at a minimum follow these <br />general guidelines: <br />47 <br />