My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-101B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-101B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 11:52:03 AM
Creation date
8/6/2018 10:49:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/05/2018
Control Number
2018-101B
Agenda Item Number
8.E.
Entity Name
Costello Brothers Marine Construction, Inc.
Subject
Replace conveyors at PC Main Screening System
Area
1700 Aviation Boulevard
Bid Number
2018055
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER may determine or OWNER may withhold, in accordance with paragraph <br />14.02 of the General Conditions: <br />a. Ninety percent (90%) of Work completed (with the balance being retainage). <br />There will be no payment for the cost of materials and equipment not incorporated <br />in the Work but stored on the Project site. <br />6.03 Final Payment <br />A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of <br />the General Conditions, OWNER shall pay the remainder of the Contract Price as <br />recommended by ENGINEER as provided in said paragraph 14.07. <br />ARTICLE 7 - INDEMNIFICATION <br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with <br />paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br />following representations: <br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the <br />other related data identified in the Bidding Documents. <br />B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br />general, local, and Site conditions that may affect cost, progress, and performance of the <br />Work. <br />C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and <br />Regulations that may affect cost, progress, and performance of the Work. <br />D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of <br />subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br />in or relating to existing surface or subsurface structures at or contiguous to the Site <br />(except Underground Facilities) which have been identified as provided in paragraph 4.02 <br />of the General Conditions and (2) reports and drawings of a Hazardous Environmental <br />Condition, if any, at the Site which have been identified as provided in paragraph 4.06 of <br />the General Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br />done so) all examinations, investigations, explorations, tests, studies, and data concerning <br />conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site <br />which may affect cost, progress, or performance of the Work or which relate to any aspect <br />of the means, methods, techniques, sequences, and procedures of construction to be <br />employed by CONTRACTOR, including applying the specific means, methods, <br />techniques, sequences, and procedures of construction, if any, expressly required by the <br />Contract Documents to be employed by CONTRACTOR, and safety precautions and <br />programs incident thereto <br />F. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />00520 - Agreement.doc <br />00520-3 <br />FAPurchasing\Bidst2017-2018 FY (2018000) 2018055 PC Main Screen Replacement\00520 - Agreement.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.