My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/19/2018
CBCC
>
Meetings
>
2010's
>
2018
>
06/19/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 2:01:26 PM
Creation date
8/10/2018 12:23:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/19/2018
Meeting Body
Board of County Commissioners
Document Relationships
06/19/2018 (2)
(Agenda)
Path:
\Meetings\2010's\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X <br />INDIAN RIVER COUNTY, FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: June 11, 2018 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services <br />Prepared By: John M. Boyer, P.E., Utilities Engineer <br />Subject: Approval of Blue Goose Construction Work Authorization 2018-003: "61ST Drive <br />Water Main Replacement" <br />DESCRIPTION AND CONDITIONS: <br />Indian River County Department of Utilities Services (IRCDUS) will need to replace a segment of 6" water <br />main along 611t Drive north of CR 510. The leaking segment was installed via directional bore; a new <br />directional bore will be installed in its place. <br />A breakdown of labor and.material cost is presented below. <br />ANALYSIS: <br />Staff has determined the most efficient and timely method to construct the replacement water main is to <br />utilize the IRCDUS labor contractor, Blue Goose Construction. A list of the anticipated labor and material <br />quantities was prepared, and bid prices from the Blue Goose Construction contract were used to calculate <br />the labor expense. The total material cost was based on unit prices derived from the Annual Contract for <br />Utility Warehouse Stock. <br />Construction cost breaks down as follows (see Attachment 1): <br />1. Labor Expense (Blue Goose Construction): $27,775.00 <br />2. Materials: $ 7,339.20 <br />Total Construction Cost: $35,114.20 <br />FUNDING: <br />Funds for this project are derived from the Renewal and Replacement (R&R) budget in the operating fund. <br />The operating fund budget is derived from water and sewer revenues. <br />ACCOUNT NAME <br />ACCOUNT NUMBER <br />AMOUNT <br />611t Drive Water Main Replacement <br />1 47123536-044699-18524 <br />$35,114.20 <br />102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.