My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/19/2018
CBCC
>
Meetings
>
2010's
>
2018
>
06/19/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 2:01:26 PM
Creation date
8/10/2018 12:23:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/19/2018
Meeting Body
Board of County Commissioners
Document Relationships
06/19/2018 (2)
(Agenda)
Path:
\Meetings\2010's\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
436
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 2018-003 <br />61" Drive Water Main Replacement <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: June 11, 2018 <br />ATTACHMENT 2 <br />EFFECTIVE DATE: June 19, 2018 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9. M14 <br />PROJECT: 61St Drive Water Main Replacement <br />COUNTY UTILITY PROJECT NO.: UCP NIA CONTRACTOR'S PROJECT NO.: N A <br />COUNTY WIP. No. 47123536-044699-1852 <br />You are directed to proceed promptly with the following work: <br />Description: Install 6" directional bore to replace failed existing water main along 61" Drive. <br />Method of determining Contract Price: <br />Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />© Lump Sum <br />© Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost = <br />$27,775.00 <br />Estimated <br />90 days from NTP <br />Contract Time: <br />ACCEPT RECOMMENDED: <br />By: By: <br />Blue Goose Construction John M. Boyer E. <br />- --Labor Contractor- - Utilities Engineer— <br />Date: 4� /// t Z_e"01 Date: <br />APPROVED: <br />By: <br />COUNTY, CHAIRMAN <br />Peter D. O'Bryan — <br />Date: <br />F:\Utilities\UTIUTY - Engineering\Projects - Capital Projects\18-0516 63stOR WaterRep\Agenda Item\18-0619 WA Approval\Work <br />Authorization No. 2018.003.doc <br />105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.