Laserfiche WebLink
WORK AUTHORIZATION DIRECTIVE <br />No. 2018-004 <br />12w Street SW Water Service Replacement <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: May 30, 2018 <br />ATTACHMENT 1 <br />EFFECTIVE DATE: June 19, 2018 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT- WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT BID NO. 2015001 AWARDED September 9, 2014 <br />PROJECT: 12th Street SW Water Service Replacement <br />COUNTY UTILITY PROJECT NO.: UCP N/A CONTRACTOR'S PROJECT NO.: N/A <br />'COUNTY WIP. No. N/A <br />You are directed to proceed promptly with the following work: <br />Description: Replace existing double water service. <br />Method of determining Contract Price: <br />© Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />0 Lump Sum <br />Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost = <br />$2,113.13 <br />Estimated <br />90 days from NTP <br />Contract Time: <br />ACCEPTE <br />By:--=� <br />-- — — -Blue Goose -Construction <br />.- <br />Laborr Contractor <br />Date: <br />RECOMMENDED: <br />By: Z�&� <br />- <br />_11ohn M. Boyer, <br />Utilities Engineer <br />Date: 40/46 <br />APPROVED: <br />By: <br />_COUNTY,.CHAIRMAN <br />Peter D. O'Bryan <br />Date: <br />F:\Uti1;ties\UTILITY - Engineering\Projects • capital Projects\18.05212325 12th St SW\Work Authorization No. 2018-004.doc <br />108 <br />