My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/12/2018
CBCC
>
Meetings
>
2010's
>
2018
>
06/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 1:50:43 PM
Creation date
8/13/2018 10:54:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/12/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Prior to issuance of a certificate of completion for phase 4, a west bound <br />left -turn lane shall be constructed on 37th Street at the project's entrance, <br />unless a reanalysis is approved by Public Works that demonstrates that the <br />left -turn lane is not warranted. [Future] <br />4. Prior to issuance of a certificate of completion for phase 2, the applicant shall <br />complete a community pool and a clubhouse (minimum enclosed building area of <br />5,000 sq. ft.). [Complete] <br />5. Prior to or via the final plat process, the applicant shall establish conservation <br />easements over existing native upland and wetland areas, as shown on the <br />conceptual PD plan. [Ongoing] <br />6. Via the final plats for the portions of the project that are adjacent to 33rd Street and <br />58th Avenue, the applicant shall dedicate drainage easements to the County to <br />accommodate stormwater run-off treatment for improvements to 33rd Street and <br />58th Avenue. [Ongoing] <br />7. The Harmony Reserve project site shall revert to its original RS -3 zoning if project <br />construction has not commenced within 7 years of the date of the conceptual PD <br />plan and PD rezoning approval. [Reverter no longer applicable] <br />8. Lots on the project perimeter shall be restricted to one story homes. [Ongoing] <br />9. Via the PD final plat process, the Harmony Reserve re -plats that affect any portion <br />of Albrecht Acres shall be structured so as not to eliminate or interfere with any of <br />the rights afforded by the Albrecht Acres plat that provide for access and services to <br />the enclave parcels. [Ongoing] <br />ATTACHMENTS: <br />1. Application <br />2. Location Map <br />3. Section 902.12 <br />4. Conceptual PD Plan Existing and Proposed <br />5. Preliminary PD Plan Existing and Proposed <br />6. Aerial <br />7. 5-10-18 Draft PZC Minutes <br />8. Ordinance <br />87 <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@442383BO\@BCL@442383BO.rtf 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.