My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/12/2018
CBCC
>
Meetings
>
2010's
>
2018
>
06/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 1:50:43 PM
Creation date
8/13/2018 10:54:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/12/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
498
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The PD Rezoning Process <br />The PD rezoning review, approval, and development process is as follows: <br />STEP 1 Rezoning and conceptual PD plan approval: review and recommendation made by <br />staff and by the PZC. Final action taken by the Board. <br />STEP 2 Preliminary PD plan (combination of site plan and preliminary plat) approval: <br />review and recommendation made by staff. Final action taken by the PZC, subject <br />to the Board's action on the rezoning request. <br />STEP 3 Land Development Permit or Permit Waiver: reviewed and issued by staff for <br />construction of subdivision improvements (roads, utilities, drainage). <br />STEP 4 Building Permit(s): reviewed and issued by staff for construction of buildings. <br />STEP 5 Final PD Plat approval: review and recommendation made by staff. Final action <br />taken by the Board. <br />STEP 6 Certificate of Occupancy: issued by staff (after inspections) for use and occupancy <br />of buildings. <br />The applicant is pursuing STEPS 1 and 2 of the process. <br />Once a PD conceptual plan is approved, only minor modifications to the conceptual plan may be <br />approved at a staff level. Any changes proposed to an approved conceptual plan that would reduce <br />setbacks, intensify the site use (e.g. increase the maximum number of lots), or reduce compatibility <br />elements (e.g. reduce buffering) may be approved only via a process involving public hearings held <br />by both the PZC and the Board, such as this request. This is such a request. If approved by the PZC <br />and the Board, the next step in the process will be the land development permit process. <br />• Proposed PD District for the Project Site <br />The subject site has an L-2 land use designation. Since the land use designation controls the use <br />of the property by limiting the zoning districts applicable to the property, any rezoning must be <br />compatible with the uses and densities allowed by the property's land use designations. Once a <br />specific PD rezoning is approved for a site, the applicable PD conceptual plan adopted as part of <br />the rezoning will limit the type of specific uses and the densities allowed on the subject site. If <br />approved this will modify the existing PD district. The approved conceptual plan has established <br />the dimensional criteria applicable to the site, which will not change. <br />Although PD zoning district parameters are flexible, certain standards related to uses, <br />compatibility (buffering), infrastructure improvements, dimensional criteria, and open space areas <br />are set forth in Chapter 915 (P.D. Process and Standards for Development ordinance) of the <br />county's land development regulations (LDRs). The approved criteria which are not proposed to <br />change are as follows: <br />78 <br />C:\Users\legistar\AppData\L.ocal\Temp\BCL Technologies\easyMF 8\@BCL@442383BO\@BCL@442383BO.rtf 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.