Laserfiche WebLink
the exception of a 40' corner clip at the corner of 58th Avenue and 37th Street. The <br />corner clip is shown on the conceptual and preliminary PD plan and is to be <br />dedicated to the County without compensation prior to issuance of the project's first <br />land development permit. <br />12. Traffic Circulation: There is no change to the overall traffic circulation system or <br />conditions which are described below from the previous approval. Internal access to the <br />two parcels have been provided by extending a cul-de-sac which provides access to the <br />proposed new lots. The internal circulation plan has been reviewed and approved by <br />Traffic Engineering. <br />The applicant proposes two gated access points to the project, one on 33rd Street and one on <br />37th Street. No connection to 58th Avenue is proposed. The 33rd Street driveway will be a <br />full movement driveway that will align with 62 Avenue, provide initial access to the <br />development, and be served by a westbound right -turn lane. The access and turn lane will <br />be constructed in the project's first phase. The 37th Street driveway will be located on the <br />western portion of the project and will serve as a full movement driveway. This driveway <br />will be improved at an interim level in phase 1 to serve as a construction and emergency <br />access driveway during construction of phases 1 — 2, and then will be improved as a <br />permanent project entrance in phase 3, and possible off-site improvements to be <br />re-evaluated prior to the issuance of an LDP for Phase 4 are described below. <br />All streets are proposed to be private. All access points and the internal circulation has <br />been approved by Traffic Engineering and Fire Prevention. <br />A traffic impact analysis (TIA) has been reviewed and approved by Traffic Engineering. <br />Based on the TIA, the following improvements are required: <br />1. A westbound right -turn lane on 33rd Street at the project entrance (phase 1). <br />2. A westbound left -turn lane on 37th Street at the project entrance (phase 4). <br />The westbound left -turn lane on 37th Street in phase 4 is subject to an option for the <br />developer to re -analyze the turn lane warrant prior to issuance of a land development <br />permit for phase 4. Unless a re -analysis is approved by Public Works that documents that <br />a westbound left -turn lane on 37th Street at the project entrance is not warranted, the turn <br />lane must be constructed prior to issuance of a certificate of completion for phase 4. If a <br />re -analysis approved by Public Works demonstrates that the westbound turn lane is not <br />warranted, then the turn lane will not be required by the County. <br />13. Utilities: Connection to public water and wastewater are required and proposed by the <br />applicant. These utility provisions have been approved by the Health Department and the <br />County Department of Utility Services. <br />14. Dedications and Improvements: The following dedication and improvement is required <br />and related to the addition of the 2.15 acres. <br />84 <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@442383BO\@BCL@442383BO.rtf 9 <br />