My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/10/2018
CBCC
>
Meetings
>
2010's
>
2018
>
07/10/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 2:21:12 PM
Creation date
8/13/2018 11:25:58 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/10/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional or alternative requirements may be applied by the County based on <br />County policy, provided that such policy(ies) do not violate CDBG rules or <br />regulations. <br />F. Contractor Disqualification <br />Contractors may be prohibited or removed from program participation for, but not <br />limited to: <br />1. Poor workmanship or use of inferior materials. <br />2. Evidence of bidding irregularities such as "low -balling" (submitting an <br />unreasonably low bid in the hopes of increasing the bid amount through <br />change orders once construction has commenced), bid rigging, collusion, <br />kickbacks, and any other unethical practice.-,,, <br />3. Failure to abide by the work write-up; failure to complete work write-up (and <br />bid) accomplishments, and any attempts to avoid specific tasks in attempts to <br />reduce costs. I ./ <br />4. Failure to pay creditors, suppliers, Laborers or subcontractors promptly and <br />completely. <br />5. Disregarding contractual obligations or programprocedures\. <br />6. Loss of license(s), insurance,or bonding. <br />7. Lack of reasonable cooperation with homeowners, HRS, PA, rehabilitation <br />staff or the others involved in the,work. <br />8. Abandonment -of a job. <br />9. Failure tofcompl toe work ina;im\elmann r� <br />10. Inabilitylor failure to direct the work/in a competent and independent manner. <br />11. Failure to,honor warranties. ` <br />12. Ineligibility to enternto federally or state assisted contracts as determined by <br />ftheU:S.,Secret `ry-of Labor, HUD or FDEO. <br />13.Other just cause thatwould`expose the)Program or homeowner to <br />y (unacceptable risk. � <br />14. Failure to resplond to a' ..minimum of three (3) consecutive requests for bids. <br />15`A�t the contractors�request.� <br />G. Eligibility. Inspection. <br />Each Applicant ho applies for rehabilitation assistance is initially screened to <br />determine whiether he/she is eligible for a 100% Deferred Payment Loan. A <br />preliminary inspection'of the Applicant's unit is then conducted to determine <br />feasibility of rehabilitation. <br />If either the owner or the structure does not meet eligibility requirements for <br />program participation, the HRS will reject the unit/Applicant. In the case of owner - <br />occupied rehabilitation and upon PA review and approval, a written rejection <br />notification will be sent to the Applicant via certified mail within ten (10) days <br />stating the reason for rejection. <br />Ito <br />
The URL can be used to link to this page
Your browser does not support the video tag.