Laserfiche WebLink
replacement housing unit that meets all of the above and all other criteria in <br />this HAP. Redevelopment and replacement units must meet all of these <br />requirements to be eligible. <br />L. Structural Integrity <br />M. <br />For all CDBG programs, rehabilitation requires that at least twenty percent (20%) <br />(CDBG and DRI) of the original structure remain after construction, based upon <br />the following formula. Three (3) major components of the house are considered, <br />with each component weighted to total one hundred percent (100%) of the <br />structural value of the house. These components and ratios are: roof - twenty <br />percent (20%), exterior walls - sixty percent (60%), and flooring system - twenty <br />percent (20%). <br />As an illustration, assume fifty percent (.50%)fof the,roof must be replaced, fifty <br />percent (50%) of the walls must be replaced and twenty five percent (25 %) of <br />the flooring system (including framing)rriust be replace&fhe factors are then <br />ratioed based on the 20/60/20 formula�\so that fifty percent,(,50%) replacement of <br />the roof is equal to replacing ten percent (.10%) of the structure, fifty percent <br />(50%) replacement of the exterior walls equals thirty percent 1(30%replacement <br />of the structure, and twenty-fi e,(25 %) replacement of the flooring -system equals <br />five percent (5%) replacemiehlt of the`tructure:�Thus, replacement equals ten <br />percent (10%), plus thirty percent (30%);,plus five percent (5%), or a total of <br />forty-five (45%) of -the structure. This leaves -fifty-five percent (55%) of the original <br />structure, indicating t ah t the structure isffeasible for rehabilitation. <br />This calculationn\will be performed by th6HRS. Should significant deterioration <br />occur between application approval and\the time the unit is scheduled for <br />rehabilitation, the�unit­will be_ a ev`uatedor continued eligibility and a decision <br />made -by -the HRS whether to repl.ace,it with an alternate unit in accordance with <br />current FDEO,contract`reauirements._ <br />Pertaininig to the CDBG\and DRI categories, as an additional means of guarding <br />against program penalties for substantial reconstruction of a dwelling, the <br />following coshmits are applicable to all rehabilitation areas. These limits are <br />above the allowable�CDBG financing limits, and assume requirements for owner <br />contributions or`leveraging with other funding sources. The limits may be <br />exceeded for rehabilitation/replacement costs when alternative funds are <br />available for leveraging, but must be specifically approved by the County <br />Commission or PA as exceeding the described limits. <br />1. $80,000 per single family detached house (CDBG and DRI) <br />2. $50,000 per unit of a duplex, Townhome, or Condominium unit (DRI) <br />3. $20,000 per mobile home unit built after Jan. 1, 1997( DRI) <br />114 <br />