My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/10/2018
CBCC
>
Meetings
>
2010's
>
2018
>
07/10/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2021 2:21:12 PM
Creation date
8/13/2018 11:25:58 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/10/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/aP-a' <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />FROM: Richard B. Szpyrka, P.E., Public Works Director <br />SUBJECT: John's Island Request for Temporary Easement for Reclaimed Water Line Construction <br />DATE: July 4, 2018 <br />DESCRIPTION AND CONDITIONS <br />On December 5, 2017 the Board of County Commissioners (County) entered into an agreement with <br />John's Island Water Management, Inc., (JIWM) for the County to provide reclaimed water to JIWM. <br />Reclaimed water is available at the County reclaimed water facility located at 77th Street. At its own <br />expense, JIWM is required to design, obtain all necessary permits, and construct a reclaimed water <br />transmission line to County and Department of Environmental Protection requirements to deliver the <br />reclaimed water from the County 77th Street facility to JIWM. <br />JIWM is currently in the permitting process to obtain permits from IRC Public Works (right-of-way), IRC <br />Utilities, and the Department of Environmental Protection (DEP). JIWM has already obtained a SJRWMD <br />permit modification for the project. As part of the permitting process, DEP has requested thatthe County <br />either sign the permit application as a co -applicant or provide temporary easements to JIWM to install <br />the subaqueous crossing from the west side of the Indian River Lagoon (IRL) at 69th Street to Old Winter <br />Beach Road on the east side of the IRL. The crossing route will take the transmission pipe line under the <br />County owned bridge tender park on the end of Old Winter Beach Road, which will also require a <br />temporary easement. After internal discussions, it is the consensus of staff that providing temporary <br />construction easements to JIWM is the best option. By providing the easements, the County will not <br />become an applicant on the project and will limit liability duringthe permitting and/or construction of the <br />p roj a ct. <br />Per DEP, the time length for the temporary construction easement must coincide with the timeframe of <br />the DEP construction permit. This duration is a maximum of five -years in length or sooner if the project is <br />complete and DEP signs off on the completed construction. The requested easements are temporary, as <br />upon the completion of construction, the reclaimed water transmission line will be conveyed to the <br />County for operation and maintenance. This will allow the County to provide reclaimed water to other <br />customers on the barrier island in the future. <br />FUNDING <br />No funding is necessary for this item. <br />RECOMMENDATION <br />Staff recommends that the Board of County Commissioners approve the temporary construction <br />easement and authorize the Chairman to execute said easement on behalf of the County upon review <br />and approval of the easement by the County Attorney as to form and legal sufficiency. <br />ATTACHMENTS <br />Easement Agreement <br />Easement Sketch and Descriptions <br />APPROVED AGENDA ITEM FOR: July 10, 2018 162 <br />
The URL can be used to link to this page
Your browser does not support the video tag.