My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-146
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 1:29:52 PM
Creation date
8/17/2018 12:36:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
08/14/2018
Control Number
2018-146
Agenda Item Number
8.D.D.
Entity Name
Johnson Davis
Subject
Air Release Valve (ARV)
Forcemain Replacement
Area
Change Order 1
Project Number
2018-047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
698 J01hNS0*VA HS 6VC <br />604 11lt.1AZ ❑1l DRIVE <br />Ab L tsr t.t.I. r1. M.If!-1694 <br />rnO.Ye 561-5.18-11-0 r: u: s61sa5 ssa cr C0430ar <br />28 July,'_018 <br />Project: US 1 Air Release Valve and 24" Forcemain Replacement <br />Date: 28 July, 2018 <br />Bid Bid Item <br />Item No. Description <br />1 Install & Remove Temporary 8" By -Pass Forcemain (801f +/-) <br />2 Install 24" Line Stops <br />3 Remove Existing 24" DIP and Replace with 24" PVC Forcemain (201f+/-) <br />4 Remove & Replace 2" ARV & Manhole <br />5 Restoration (Sod, Asphalt, Etc.) <br />6 Public Construction Bond <br />7 Mobilization <br />8 Force Account: <br />Change Order #1 <br />Bid Bid Item <br />Item No. Description <br />C01 Add: Install & Remove Temporary 12' By -Pass Forcemain (2001f +/-, total). Includes 4 wet taps, all fittings, restraints, etc. (Two Locations) <br />CO2 Add: Install 24" Line Stops <br />CO3 Add: Remove Existing 24" DIP and Replace with 24" PVC Forcemain (201f <br />004 Add: Remove & Replace 2" ARV & Manhole <br />COS Add: Restoration (Sod, Asphalt, Etc.) <br />C06 Add: Mobilizationto 2nd ARV <br />C07 Delete: 8" By -Pass & Related . <br />Sincerely, <br />Richard.l. Miller <br />I Project Pohna;eF <br />Jive, Lantana. FL 33462 <br />'Construct with Confidence - <br />(561) 815-3023 - cell <br />(561) 588.1170 -office <br />15611270 -1814 - direc t <br />(561) 585.5252 =/ax <br />ri+eller�jolmsondovis. com <br />Estimated Unitof <br />Unit <br />Total <br />Quantity Measure <br />Price <br />Price <br />80 LF <br />$25.00 <br />$2.000.00 <br />2 EA <br />$20,000.00 <br />$40,000.00 <br />1 LS <br />$25,000.00 <br />$25,000.00 <br />1 LS <br />$20,000.00 <br />$20,000.00 <br />1 LS <br />$5,000.00 <br />$5,000.00 <br />1 LS <br />$2,000.00 <br />$2,000.00 <br />Subtotal: <br />$94,000.00 <br />1 LS <br />15000.00 <br />$15,000.00 <br />$15,000.00 <br />Total Bid Amount: $124,000.00 <br />Estimated Unit of Unit <br />Quantity Measure Price <br />200 LF <br />2 EA <br />1 LS <br />1 LS <br />1 LS <br />1 LS <br />-80 LF <br />vc sur • } ,•.",� <br />CA J <br />• „tom Nua.tfk 604141ibatn ome- Umar, Ft. 73a6I • PMne: 561.58&1171 • fre 561 -SYS -5751 Ft. ' . Kites lim- Ft. Pterce, FL MM -P"w 772458.920D • r9 <br />Total <br />Price <br />$128.29 $25,658.00 <br />$20,000.00 $40,000.00 <br />$25,000.00 $25,000.00 <br />$20,000.00 .520,000.00 <br />$S,00o.00 $5,000.00 <br />$15,000.00 $15,000.00 <br />$25.00 -$2,000.00 <br />Total CO 1: $128,658.00 <br />Original Contract Price: $124,000.00 <br />Total Change Orders: $128,658.00 <br />New Contract Price: $252,658.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.