My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-147
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2020 1:30:38 PM
Creation date
8/17/2018 12:42:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/14/2018
Control Number
2018-147
Agenda Item Number
8.J.J.
Entity Name
Ardaman and Associates
Subject
Subsurface Soil Exploration
Area
45th Street 43rd Avenue to 58th Avenue
Project Number
IRC-1722
Bid Number
RFQ 2014007
Alternate Name
Work Order No. 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
45t' Street Roadway. Improvements Page 2 <br />AAI Proposal No. 18-4472 <br />Prior to the mobilization of our, drilling equipment, we will notify Sunshine State, One -Call of Florida; <br />Inc. (SSOCOF) of our planned exploration to allow affected utility companies the opportunity to mark <br />the location of buried. utility lines in the proposed exploration areas. The locating process will require <br />a. lead time of 3 to'5 business days. We cannot take responsibility for damages to private underground <br />lines or structures and/or underground services which. do not subscribe to SSOCOF; their locations <br />should be, provided by the client prior to commencement of the field work: <br />LABORATORY TESTING <br />We preliminarily.estimate that only:routine laboratory visualclassification:of the recovered samples <br />Will be required for this project. However., gradation tests and organic content tests on select samples. <br />:will be performed if deemed necessary. The number: of laboratorytests: will be determined upon . <br />completion of the.. Oil borings and will depend on the nature, of the encountered soils,: All laboratory <br />tests will be performed in, accordance with applicable ASTM standards. <br />ENGINEERING: REPORT <br />Upon completion of our field exploration and laboratory testing program, an engineering report will. be <br />issued presenting the, findings of our explorations and, tests, .and our comments on . geotechnical <br />aspects of the project..: <br />SCHEDULE <br />Weather conditions permitting; we will start the field exploration program within.10 to 15 business days . <br />after, receiving yourwrittenauthoft ionto proceed. We preliminarily estimate that our field work will, . <br />have a. duration of 5 to 8 business days. Our laboratory testing and reportpreparation will require an <br />additional .5 Jo 10 business days to complete, however, verbal recommendations can: be provided <br />shortly after the completion of the field exploration program. <br />FEE ESTIMATE <br />Based on our.knowledge of the project to -date,. the estimated cost of our geotechnical.services for: this <br />project is $15;280:00 (including MOT): Should we encounter conditions on the site that warrant more <br />investigative: effort than anticipated, we will inform you immediately. Additional work or meetings in <br />response to review of the report will incur an additional charge. The services. are itemized below: <br />Field Reconnaissance- <br />Senior <br />econnaissance Senior Project Engineer est. 4 -hours @ $115:00/hour......:.......................,,..:....:...... ..................... $460.00. <br />Standard Penetration Test borings: . <br />2 mobilizations @ $350:00/mobilization..................:... ......... ............... $700.00 <br />........... <br />Standby between boreholes for MOT setup: est. 2 hours @ $250.00/hour:..... :......... .......... ;....... $500.00 <br />13 SPT boringsto 15 feet (195 feet total) @$14.5.0/foot.................. ................................ ......... $2,827.60 <br />4. SPT borings to 35 ;feet (140 feet total) @.$14.50/foot.......::................::.:...:...:......:.. ...:.. $2,030.00 <br />Coring Equipment: 1. day @ $150.00/day..:.: ..:..:..... .:..:................................... ....... $150.00 <br />..... ....... <br />Coring Crew: est. 12 hours @ $100.00/hour (two Sr. Field Technicians @ $50,00/hour) ............. $1,200.00 <br />Asphalt Patch (lump sum)`.....::.:.:....:..................:..:..................................:...............................: $8 . <br />. 2 50 <br />Laboratory Testing <br />Organic Testing: est. 4 tests @ $30'.00/test. .. . .. ........: $120.00 <br />........ ............... .......... .... . <br />Percent Fines Content Tests: est. 10 tests @ 35.00/test:.............. ...:.............. ...:.............. , ............... $350.00 <br />Engineering and"Report Preparation. <br />Senior Project Engineer: est. 4.hours @ 115.00/hour .. $460.00 <br />Project Engineer: est. 20 hours @ $95.00/hour.............................................. $1,900.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.